Private company

Carlton Trail Railway

Canadian shortline railway

The Carlton Trail Railway (reporting mark CTRW) is a shortline railway with its headquarters in Prince Albert, Saskatchewan. It is operated by OmniTRAX, an American transportation company in Denver, Colorado. Carlton Trail has been operating on ex-Canadian National track since December 8, 1997; however, after the acquisition of the branch line CTRW also purchased from CN the Birch Hills-Fenton-Prince Albert branch line in 2001.2 Wikipedia text CC BY-SA 4.0

Last updated Oct 20, 2026.

Overview

1997Founded1

The Carlton Trail Railway (reporting mark CTRW) is a shortline railway with its headquarters in Prince Albert, Saskatchewan. It is operated by OmniTRAX, an American transportation company in Denver, Colorado. Carlton Trail has been operating on ex-Canadian National track since December 8, 1997; however, after the acquisition of the branch line CTRW also purchased from CN the Birch Hills-Fenton-Prince Albert branch line in 2001. Since the closure of the pulp mill in 2006, Carlton Trail has typically adhered to a schedule of twice weekly rail service, hauling approximately 2000 carloads per year. According to OmniTrax president Darcy Brede, when the mill reopens in 2014, the railway will begin six days a week service, hauling approximately 3000 carloads a year.2

Corporate structure

Carlton Trail Railway is part of a group headed by OmniTRAX. 10 entities, 2 countries on record. Switch between the flow chart and the network, and select any entity to see its details.

Built from parent and subsidiary links from GLEIF, the Global Legal Entity Identifier Foundation (CC0); subsidiaries, stakes and holdings from Wikidata (CC0). Each entity in the chart links to its source.

The story

The Carlton Trail was originally an overland transportation route connecting Winnipeg and Fort Edmonton during the early 19th century and the latter days of the fur trade in the Northwest Territories. The Carlton Trail cut its way into what is now Saskatchewan southeast of Melville, headed in a northwesterly route towards Batoche; where the trail crossed the South Saskatchewan River and then towards Fort Carlton. The trail continued on past Fort Carlton along the northern banks of the North Saskatchewan River for another 980 km to Fort Pitt and finally terminating at Fort Edmonton. OmniTRAX had decided during the inception of the new shortline, that it should be named after this famous trading route; hence the name of the railway being Carlton Trail Railway.

Much of the southern portion of Carlton Trail Railway's Speers Subdivision straddles the proximity of the original Carlton Trail; which would have followed the North Saskatchewan River towards the Battlefords. Carlton Trail Railway had originally taken control of the Warman subdivision and the Speers subdivision. At Warman Carlton Trail transfers onto CN and has limited trackage rights into CN's Saskatoon Chappell Yard. The Speers subdivision extends from the Speers Jct north on both former Canadian National and Canadian Pacific rail line until it reaches Meadow Lake.

The Speers subdivision proved problematic due to past neglect, and on October 7, 2008 Carlton Trail gave notice that it was discontinuing rail services to Meadow Lake on April 1, 2009. Carlton Trail continues to own the Meadow Lake Branch, but has made no indication that operations will start up anytime soon. Many rural communities however have taken interest in the line and recent discussions indicate it could be purchased by the local Rural Municipalities, under the name North Central Rail. As of November, 2010 North Central Rail Ltd and OmniTRAX have yet to reach a tentative agreement in the transfer of ownership of the Speers Subdivision. According to Ray Wilfing, chair of NCR Ltd., OmniTRAX has delayed the sale of the line by not responding to North Central's formal offer in August 2009. North Central Rail lodged a negotiating in bad faith complaint with the Highway Traffic Board in December 2009 in order to pressure OmniTRAX to return to the table to discuss the offer. OmniTRAX was given a deadline of February 15, 2010 to come up with a reasonable response to the offer for the rail line. On 15 February, OmniTRAX responded with a counteroffer that was well beyond what North Central Rail could afford. On July 16, 2010 OmniTRAX put the Speers Subdivision up for sale for 11.2 million dollars, a price the Rural Municipality of Meadow Lake along with 17 other municipalities would like a justification for. Updated 2013 Google Street View imagery of the former railway crossing on the Yellowhead Highway at Denholm, Saskatchewan (the southern terminus of the branch and only connection of the branch to the rest of the North American rail network) and various other places along the line shows that the tracks along the length of the line have been torn up and the line abandoned.

On January 17, 2001 CTR purchased the line between Prince Albert and Birch Hills (40.87 km), though this line is rarely if ever used as it serves no economical purpose. CTR also briefly controlled the Arborfield branch line when CN placed it up for sale. Due to the long distance between the Aborfield subdivision and head offices in Prince Albert, CTR placed the line up for sale and later sold it to Arborfield Thunder Rail Ltd.

From Wikipedia’s article on Carlton Trail Railway, shared under CC BY-SA 4.0.3

Subsidiaries and ownership

Parent company

From Wikidata.1

Acquisitions

  1. Succeeded Canadian National Railway1

Timeline

  1. 1997Founded Founded1

Sources

The numbers on this page point here. Each one links to the record it came from.

  1. 1
  2. 2
  3. 3