U.S. company that built western leg of the first transcontinental railroad

The Central Pacific Railroad (CPRR) was a rail company chartered by U.S. Congress in 1862 to build a railroad eastwards from Sacramento, California, to complete most of the western part of the "First transcontinental railroad" in North America. Incorporated in 1861, CPRR ceased independent operations in 1885 when the railroad was leased to the Southern Pacific Railroad Company. Its assets were formally merged into Southern Pacific in 1959.2 Wikipedia text CC BY-SA 4.0

Last updated Oct 20, 2026.

Overview

Jun 28, 1861Founded1
  • HeadquartersSacramento1
  • Founded inSacramento1
  • Legal formjoint-stock company1
CPRR Locomotive -113 FALCON 1869
Photo: John B. Silvis (UPRR photographer) (1830-1900), Public domain, via Wikimedia Commons5

The Central Pacific Railroad (CPRR) was a rail company chartered by U.S. Congress in 1862 to build a railroad eastwards from Sacramento, California, to complete most of the western part of the "First transcontinental railroad" in North America. Incorporated in 1861, CPRR ceased independent operations in 1885 when the railroad was leased to the Southern Pacific Railroad Company. Its assets were formally merged into Southern Pacific in 1959.2

Corporate structure

Central Pacific Railroad sits at the top of its group. 2 entities, 1 country on record. Switch between the flow chart and the network, and select any entity to see its details.

Built from subsidiaries, stakes and holdings from Wikidata (CC0); major holders from Schedules 13D and 13G. Each entity in the chart links to its source.

What it owns

What Central Pacific Railroad reports owning in its annual reports to the SEC: buildings, land and equipment, real estate and locations, investments, intangible assets and inventory, at the end of its latest fiscal year and a year before.

Stakes and holdings (Wikidata)

Things Wikidata records the company as owning, with the share when stated.1

The story

History

Authorization and construction

In the fall of 1860, Charles Marsh, a surveyor, civil engineer and water company owner, met with Theodore Judah, a civil engineer, who had recently built the Sacramento Valley Railroad from Sacramento to Folsom, California and was working on the California Central Railroad to extend the former from Folsom to Marysville. Marsh, who had already surveyed a potential railroad route between Sacramento and Nevada City, California, a decade earlier, went with Judah into the Sierra Nevada Mountains. There they examined the Henness Pass Turnpike Company's route (Marsh was a founding director of that company). They measured elevations and distances, and discussed the possibility of a transcontinental railroad. Both were convinced that it could be done.

In December 1860 or early January 1861, Marsh met with Judah and Daniel Strong in Strong's drug store in Dutch Flat, California, to discuss the project, which they called the Central Pacific Railroad of California. James Bailey, a friend of Judah, told Leland Stanford that Judah had a feasible route for a railroad across the Sierras, and urged Stanford to meet with Judah. In early 1861, Marsh, Judah and Strong met with Collis P. Huntington, Leland Stanford, Mark Hopkins Jr. and Charles Crocker to obtain financial backing. Papers were filed to incorporate the new company, and on April 30, 1861, the eight of them, along with Lucius Anson Booth, became the first board of directors of the Central Pacific Railroad.

Planned by Judah, the Central Pacific Railroad was promoted by Congress by the Pacific Railway Act of 1862 which authorized the issuance of government bonds and land grants for each mile that was constructed. Stanford served as president (at the same time he was elected governor of California), Huntington served as vice-president in charge of fundraising and purchasing, Hopkins was treasurer and Crocker was in charge of construction. They called themselves "The Associates", but became known as "The Big Four". Construction began in 1863 when the first rails were laid in Sacramento.

Construction proceeded in earnest in 1865 when James Harvey Strobridge, the head of the construction work force, hired the first Cantonese emigrant workers at Crocker's suggestion. The construction crew grew to include 12,000 Chinese laborers by 1868, when they breached Donner summit and constituted eighty percent of the entire work force. The "Golden spike", connecting the western railroad to the Union Pacific Railroad at Promontory, Utah, was hammered on May 10, 1869. Coast-to-coast train travel in eight days became possible, replacing months-long sea voyages and lengthy, hazardous travel by wagon trains.

In 1885, the Central Pacific Railroad was acquired by the Southern Pacific Company as a leased line. Technically the CPRR remained a corporate entity until 1959, when it was formally merged into Southern Pacific. (It was reorganized in 1899 as the Central Pacific "Railway".) The original right-of-way is now controlled by the Union Pacific, which bought Southern Pacific in 1996.

The Union Pacific-Central Pacific (Southern Pacific) main line followed the historic Overland Route from Omaha, Nebraska, to San Francisco Bay.

Chinese labor was the most vital source for constructing the railroad. Most of the railroad workers in the west were Chinese, as they could be hired at a lower cost to do the difficult work. Fifty Cantonese emigrant workers were hired by the Central Pacific Railroad in February 1865 on a trial basis, and soon more and more Cantonese emigrants were hired. Working conditions were harsh, and Chinese were compensated less than their white counterparts, leading to far less white workers being hired. Chinese laborers were paid thirty-one dollars each month ($1,111 in 2025), and while white workers were paid the same, they were also given room and board. In time, CPRR came to see the advantage of good workers employed at low wages: "Chinese labor proved to be Central Pacific's salvation."

The difficulties faced by the Central Pacific in the Sierra Nevada – particularly the extensive tunneling required – were far more formidable than those encountered by the Union Pacific Railroad in the Rocky Mountains. The story that Chinese workers were suspended in wicker baskets over vertical granite cliffs at Cape Horn, California, to drill and blast a ledge for the Central Pacific has been repeated and exaggerated by uncritical historians.

Read the full text

There is reliable, primary-source evidence stating that surveyors used safety ropes while staking out the route, but nothing about construction workers using ropes. Digging the cut was done downward from the top, and from each horizontal end of the cut. It is conceivable that a safety rope would have been useful when digging an initial footpath, that could then be enlarged into a shelf, but there was no reason to be suspended by ropes to dig or drill into the face of the cut. It wasn't done that way. And, most of the Chinese labor was not hired until later. So, the gangs that did the digging at Cape Horn may have been Irish.

Central Pacific Director Charles Marsh had extensive civil engineering experience in projects of this nature, both from planning an earlier proposed railroad into the Sierras, and from building ditches and flumes through those mountains for his water company.

Financing

Construction of the road was financed primarily by 30-year, 6% U.S. government bonds authorized by Sec. 5 of the Pacific Railroad Act of 1862. They were issued at the rate of $16,000 ($265,000 in 2017 dollars) per mile of tracked grade completed east of the designated base of the Sierra Nevada range near Roseville, California, that state geologist Josiah Whitney had determined was the geologic start of the Sierras' foothills. Sec. 11 of the Act also provided that the issuance of bonds "shall be treble the number per mile" (to $48,000) for tracked grade completed over and within the two mountain ranges (but limited to a total of 300 miles (480 km) at this rate), and "doubled" (to $32,000) per mile of completed grade laid between the two mountain ranges. The U.S. Government Bonds, which constituted a lien upon the railroads and all their fixtures, were repaid in full (and with interest) by the company as and when they became due.

Sec. 10 of the 1864 amending Pacific Railroad Act (13 Statutes at Large, 356) additionally authorized the company to issue its own "First Mortgage Bonds" in total amounts up to (but not exceeding) that of the bonds issued by the United States. Such company-issued securities had priority over the original Government Bonds. (Local and state governments also aided the financing, although the City and County of San Francisco did not do so willingly. This materially slowed early construction efforts.) Sec. 3 of the 1862 Act granted the railroads 10 square miles (26 km2) of public land for every mile laid, except where railroads ran through cities and crossed rivers. This grant was apportioned in 5 sections on alternating sides of the railroad, with each section measuring 0.2 miles (320 m) by 10 miles (16 km). These grants were later doubled to 20 square miles (52 km2) per mile of grade by the 1864 Act.

Although the Pacific Railroad eventually benefited the Bay Area, the City and County of San Francisco obstructed financing it during the early years of 1863–1865. When Stanford was Governor of California, the Legislature passed on April 22, 1863, "An Act to Authorize the Board of Supervisors of the City and County of San Francisco to take and subscribe One Million Dollars to the Capital Stock of the Western Pacific Rail Road Company and the Central Pacific Rail Road Company of California and to provide for the payment of the same and other matters relating thereto" (which was later amended by Section Five of the "Compromise Act" of April 4, 1864). On May 19, 1863, the electors of the City and County of San Francisco passed this bond by a vote of 6,329 to 3,116, in a highly controversial Special Election.

The City and County's financing of the investment through the issuance and delivery of Bonds was delayed for two years, when Mayor Henry P. Coon, and the County Clerk, Wilhelm Loewy, each refused to countersign the Bonds. It took legal actions to force them to do so: in 1864 the Supreme Court of the State of California ordered them under Writs of Mandamus (The People of the State of California ex rel the Central Pacific Railroad Company vs. Henry P. Coon, Mayor; Henry M. Hale, Auditor; and Joseph S. Paxson, Treasurer, of the City and County of San Francisco. 25 Cal. 635) and in 1865, a legal judgment against Loewy (The People ex rel The Central Pacific Railroad Company of California vs. The Board of Supervisors of the City and County of San Francisco, and Wilhelm Lowey, Clerk 27 Cal. 655) directing that the Bonds be countersigned and delivered.

In 1863 the State legislature's forcing of City and County action became known as the "Dutch Flat Swindle". Critics claimed the CPRR's Big Four intended to build a railroad only as far as Dutch Flat, California, to connect to the Dutch Flat-Donner Pass Wagon Road to monopolize the lucrative mining traffic, and not push the track east of Dutch Flat into the more challenging and expensive High Sierra effort. CPRR's chief engineer, Theodore Judah, also argued against such a road and hence against the Big Four, fearing that its construction would siphon money from CPRR's paramount trans-Sierra railroad effort. Despite Judah's strong objection, the Big Four incorporated in August 1863 the Dutch Flat-Donner Lake Wagon Road Company. Frustrated, Judah headed off for New York via Panama to raise funds to buy out the Big Four from CPRR and build his trans-Sierra railroad. Unfortunately, Judah contracted yellow fever in Panama and died in New York in November 1863.

Timeline

1861

June 28, 1861: "Central Pacific Rail Road of California" incorporated; name changed to "Central Pacific Railroad of California" on October 8, 1864, after the Pacific Railway Act amendment passes that summer.

1862

July 1, 1862: President Lincoln signs the Pacific Railway Act, which authorized the Central Pacific and the Union Pacific to build a railroad to the Pacific Ocean.

1863

January 8, 1863: Ground-breaking ceremonies take place at Sacramento, California, at the foot of "K" Street at the waterfront of the Sacramento River.

October 26, 1863: First rail of the Pacific Railroad laid at Sacramento.

1864

April 26, 1864: Central Pacific opened to Roseville, 18 miles (29 km), where it makes a junction with the California Central Railroad, operating from Folsom north to Lincoln.

June 3, 1864: The first revenue train on the Central Pacific operates between Sacramento and Newcastle, California

October 8, 1864: Following passage of the amendment to the Pacific Railroad Act, the company's name is changed to "Central Pacific Railroad of California", a new corporation.

1865

February 1865: Central Pacific hired its first 50 Cantonese emigrant laborers on a trial basis.

May 13, 1865: Central Pacific opened 36 miles (58 km) to Auburn, California.

September 1, 1865: Central Pacific opened 54 miles (87 km) to Colfax, California (formerly known as "Illinoistown".)

1866

December 3, 1866: Central Pacific opened 92 miles (148 km) to Cisco, California.

1867

June 25, 1867: 5,000 Chinese railroad workers went on strike in protest against the longer hours and wage inequality they were facing.

August 28, 1867: The Sierra Nevadas were finally "conquered" by the Central Pacific Railroad, after almost five years of sustained construction effort by its mainly Chinese crew about 10,000 strong, with the successful completion at Donner Pass of its 1,659-foot (506 m) Tunnel No. 6 (a.k.a. the "Summit Tunnel").

December 1, 1867: Central Pacific opened to Summit of the Sierra Nevada, 105 miles (169 km).

1868

June 18, 1868: The first passenger train crosses the Sierra Nevada to Lake's Crossing (modern day Reno, Nevada) at the eastern foot of the Sierra in Nevada.

1869

April 28, 1869: Track crews on the Central Pacific lay 10 miles (16 km) of track in one day. To date, this is the longest stretch of track to have been built in one day.

May 10, 1869: The Central Pacific and Union Pacific tracks meet in Promontory, Utah, connecting Omaha, Nebraska with Sacramento, California.

May 15, 1869: The first transcontinental trains are run over the new line to Sacramento, California.

September 6, 1869: The first transcontinental train reaches the San Francisco Bay at Alameda Terminal, achieving the first Pacific Railroad from the Missouri river to the Pacific Ocean.

November 8, 1869: Central Pacific subsidiaries, Western Pacific Railroad (1862–1870) and San Francisco and Oakland Railroad, complete the final leg of the route, connecting Omaha, Nebraska to Oakland, California.

1870

June 23, 1870: Central Pacific is consolidated with the Western Pacific Railroad (1862–1870), San Francisco and Alameda Railroad and San Francisco and Oakland Railroad to form the "Central Pacific Railroad Co." (of June 1870).

August 22, 1870: Central Pacific Railroad Co. is consolidated with the California & Oregon; San Francisco, Oakland & Alameda; and San Joaquin Valley Railroad; to form the "Central Pacific Railroad Co.", a new corporation.

1876

April 30, 1876: Operates the California Pacific Railroad between South Vallejo and Sacramento, Calistoga and Marysville until April 1, 1885 (see below).

1877

July 16, 1877: Start of the Great railroad strike of 1877 when railroad workers on strike in Martinsburg, West Virginia, derail and loot a train; United States President Rutherford B. Hayes calls in Federal troops to break the strike.

1883

November 18, 1883: A system of one-hour standard time zones for American railroads was first implemented. The zones were named Intercolonial, Eastern, Central, Mountain, and Pacific. Within one year, 85% of all cities having populations over 10,000, about 200 cities in total, were using standard time.

1885

April 1, 1885: Central Pacific is leased to Southern Pacific.

1888

June 30, 1888: Listed by ICC as a "non-operating" subsidiary of Southern Pacific.

1899

July 29, 1899: Central Pacific is reorganized as the "Central Pacific Railway".

1959

June 30, 1959: Central Pacific is formally merged into the Southern Pacific.

From Wikipedia’s article on Central Pacific Railroad, shared under CC BY-SA 4.0.4

Subsidiaries and ownership

Also owns

From Wikidata.1

Acquisitions

  1. Succeeded California Pacific Railroad1
  2. Succeeded San Francisco and Alameda Railroad1
  3. Succeeded San Francisco and Oakland Railroad1
  4. Succeeded Western Pacific Railroad1
  5. Succeeded by Southern Pacific Transportation Company1

San Joaquin Valley Railroad (1868–1870)

Stockton and Copperopolis Railroad

Stockton and Visalia Railroad

Western Pacific Railroad (1862–1870)

From Wikipedia’s article on Central Pacific Railroad, shared under CC BY-SA 4.0.4

Timeline

  1. Jun 30, 1959Dissolved Dissolved1
  2. Apr 1, 1885Dissolved Dissolved1
  3. Jun 28, 1861Founded Founded in Sacramento1