Operation
The line was worked by independent contractors until long after other lines, which had taken operations in house upon the introduction of locomotives. The line was initially under-capitalised because many of the subscribers did not meet their dues, and it was mainly funded by the Butterley Company, a major supplier and its main creditor. The final cost was £180,000, more than Jessop's estimate of £155,000, but still much cheaper than a canal. Nevertheless, the line never achieved a profit. Francis Wright, the chairman, was later to say in 1862 "We found ourselves getting into difficulties from the third year of our existence," and added it was clear in retrospect that the line "never had a remote chance of paying a dividend on the original shares."
The railway's first steam locomotive arrived in 1841 with Peak, built by Robert Stephenson and Company. By 1860 the line had six more locomotives gradually displacing the horses. Because the inclines were too steep for adhesion traction by these early locomotives they were hauled up and down the inclines, along with their trains, by static steam engines. The hemp rope or chains initially used for hauling trains were later replaced by steel cables.
The Cromford and High Peak Railway Act 1855 (18 & 19 Vict. c. lxxv) authorised the carriage of passengers. However the one train per day each way did little to produce extra revenue, and when a passenger was killed in 1877 the service was discontinued. The line's prosperity depended on that of the canals it connected but, by the 1830s, they were in decline. This was, to a degree, offset by the increase in the trade for limestone from the quarries.
There were very few accidents. In 1857, the Cromford and Sheep Pasture inclines had been merged into one, and in 1888 a brake van broke away from a train near the summit. Gathering speed, it was unable to round the curve into Cromford Wharf. It passed over both the canal and the double track railway line, and landed in a field. A catch pit was therefore installed near the bottom. This can still be seen from the A6 with a (more recent) wrecked wagon still in it.
Read the full text
The most serious accident occurred in 1937. The line was fairly level on the approach to the Hopton Incline and it was custom to gain speed for the uphill gradient. There was a shallow curve immediately before and on this occasion the locomotive spread the track, rolled over and down the embankment with four wagons. The driver was killed and thereafter a speed limit of 40 mph (64 km/h) was strictly enforced.
During World War II, the line was used to transport bombs to the large underground munitions store at RAF Harpur Hill. The railway line ran directly through the site.
Station locations
Passenger services were introduced in stages with there being only one service a day each way between Cromford and Landmanlow in 1856. Stations were included at:
Whatstandwell
Cromford
Steeple House
Middleton
Hopton Top Wharf
Longcliffe
Friden
Hurdlow
Hindlow
Ladmanlow
The following additional stations were added in 1874. However, this was short-lived and the line was closed to passengers along with the outlying halts and minor stations in 1876.
Whatstandwell
Cromford
Sheep Pasture
Steeple House
Middleton
Hopton Top Wharf
Longcliffe
Friden
Hurdlow
Parsley Hay
Hindlow
Harpur Hill
Ladmanlow
Bunsail
Shallcross
Whaley Bridge
When in operation the services offered interchanges with the Derwent Valley Line, Ashbourne Line and Manchester, High Peak and Derbyshire Railway.