Private company

Festiniog and Blaenau Railway

Disused railway in Wales

The Festiniog and Blaenau Railway (F&BR) was a narrow gauge railway built in 1868 to connect the town of Blaenau Ffestiniog in Wales with the slate quarries around Tanymanod and the village of Llan Ffestiniog, 3+1⁄2 miles (5.6 km) to the south. At Blaenau Ffestiniog it made a direct connection with the Festiniog Railway (FR) with which it was closely associated during its fifteen-year life.2 Wikipedia text CC BY-SA 4.0

Last updated Oct 20, 2026.

Overview

1866Founded1
Festiniog and Blaenau Railway viaduct
Photo: John Thomas (1838-1905), Public domain, via Wikimedia Commons4

The Festiniog and Blaenau Railway (F&BR) was a narrow gauge railway built in 1868 to connect the town of Blaenau Ffestiniog in Wales with the slate quarries around Tanymanod and the village of Llan Ffestiniog, 3+1⁄2 miles (5.6 km) to the south. At Blaenau Ffestiniog it made a direct connection with the Festiniog Railway (FR) with which it was closely associated during its fifteen-year life. The railway was purchased by the Bala and Festiniog Railway in 1883 and converted to 4 ft 8+1⁄2 in (1,435 mm) standard gauge to extend the Bala Ffestiniog line, a branch of the GWR's line from Ruabon to Barmouth.2

The story

By the early 1860s Llan Ffestiniog had largely become a dormitory town supplying workers to the slate industry around Blaenau Ffestiniog. The quarries at Blaenau were connected to the harbour at Porthmadog by the recently built Festiniog Railway (FR) and as a result were able to significantly increase their output and profitability. However, the FR was struggling to cope ("hopelessly overburdened" according to the standard work on the F&BR) with the volume of traffic from the quarries and some owners – notably Samuel Holland, later to be a local MP – were looking for other outlets for their product at lower charges.

At the same time, several standard gauge railway companies were looking to extend their lines into the region to tap the demand for slate transport. In particular the GWR-backed Corwen and Bala Railway reached Bala, about 22 miles south of Blaenau in April 1868 and had ambitions to spread further. The LNWR were also making moves from the north, but that played no clear part in the F&BR story.

The quarries around Tanymanod – especially Craig Ddu – were not rail connected and were on the proposed route of a northward extension of the Corwen and Bala Railway. In October 1866 some quarry owners issued a prospectus announcing the formation of the Festiniog and Blaenau Railway Company to construct a line from Llan Ffestiniog to Blaenau where it would connect with the Ffestiniog Railway. In the short term this "poured water into a blocked drain" as the F&BR led only to the overstretched FR, but the line contained the seeds of at least two ambitions-cum-threats: it took a step towards the south where it might eventually meet the Corwen and Bala's ambitions from the south east and the same step south lent itself to ambitions to connect with the Cambrian Railways to the southwest. This latter bore at least legal fruit when the Merionethshire Railway gained parliamentary approval in the Merionethshire Railway Act 1871 (34 & 35 Vict. c. lxxii). That line would have continued from Llan Ffestiniog to a junction just north of Talsarnau, but no construction ever happened, "the threat of it had played its part". The prospectus made brief mention of the line being able to use the FR to "command a very large traffic in goods", but saved its most lavish imprecations for the passenger potential, notably for workmen ("very great") and tourists ("immense").

Although initially promoted as, in effect, a branch of the FR, the F&BR was built on a formation that was designed to be easily converted to standard gauge if and when an extension from the Corwen and Bala Railway approached from the south. Later writers sometimes look at the line's standard gauge successor's sinuous course and conclude it betrays its narrow gauge origins, but the trackbed and bridges were built to accommodate standard gauge trains without alteration and the line's curves' ruling minimum radius was 6 chains (120 m) as opposed to the FR's 2 chains (40 m). Even the line's steepest gradient of 1 in 68 was forced upon it by having to avoid obstacles, the original intention was to have a ruling gradient of 1 in 100. The maximum line speed of 12 miles per hour (19 km/h) was imposed by the Board of Trade. The largest feature which had to be rebuilt on conversion was the wooden viaduct between Tanymanod and Blaenau, not because it was too small, but because it was too flimsy. It was rebuilt in stone and stands to this day.

Some bridges were erected during the line's later narrow gauge years and on conversion, using metal parapets pre-cast at the Brymbo Foundry. Others of the type also existed on the standard gauge line approaching from Bala. In 2016 at least one such survived between Llan Ffestiniog and Trawsfynydd. There were connections at Board level between these railways and Brymbo.

From Wikipedia’s article on Festiniog and Blaenau Railway, shared under CC BY-SA 4.0.3

Products and brands

As foreseen in the prospectus, the narrow gauge line's primary traffic was passengers, and workmen in particular, though there is nothing in the records to hint that the predicted "immense" tourist traffic ever materialised. Goods traffic was small by comparison. Receipts in 1879, for example, included £1409 from passengers against £416 for goods.. The staff were reduced almost immediately it opened, the intermediate stations becoming unmanned by 1869.

The February 1878 timetable differs little from that of 1873, showing that all trains called at all stations on the line, as follows

Northbound ("Up")

four public trains running Monday to Saturday

Read the full text

an unadvertised morning workmen's train running Monday to Saturday

two public evening trains on Saturdays only

The journey time from Festiniog to Duffws (F&BR) was 20 minutes.

Southbound ("Down")

four public trains running Monday to Saturday

a morning workmen's train running Monday to Saturday

two public evening trains on Saturdays only

a teatime workmen's train on Saturdays only

The journey time from Duffws (F&BR) to Festiniog was 20 minutes.

There was no Sunday service.

Diphwys was the F&BR's Blaenau station and would become the site of the town's later GWR station, but it was not the Festiniog Railway's Duffws (FR) station. Through passengers from Festiniog (say) to Porthmadog Harbour would alight at the F&BR's Diphwys station and walk across Church Street in Blaenau to the Festiniog Railway's completely separate Duffws station. Most trains were timetabled to make this process workable, if tight. FR connecting trains were not held in the case of late running.

Despite the railway's short length and short life it appeared several times in the regional press as the victim of acts of god and man. A rock fall struck a passing train in 1878 and carriages were blown over in traffic in 1870 and 1881, fortunately none of these incidents caused injury. Snow stopped work in the quarries, railways and railway building in 1881 and gauge conversion work was set back by a flood in 1882. Gauge conversion work was delayed by land ownership issues in Blaenau and raised eyebrows for working on the Sabbath. The railway took people to court for trespass in 1871, 1876 and 1878, for breaking windows in 1871 and for drunken damage at Tan y Manod in 1873. A seven-year-old boy was prosecuted in 1882 for placing stones on the line.

From Wikipedia’s article on Festiniog and Blaenau Railway, shared under CC BY-SA 4.0.3

Acquisitions

  1. Succeeded by Great Western Railway1

Timeline

  1. 1866Founded Founded1