The story
History
Amalgamation
Between 1851 and 1854 the Eastern Counties Railway (ECR) under the chairmanship of David Waddington had negotiated arrangements to work most of the other railways in East Anglia resulting in a network of lines totalling 565 miles (909 km). Whilst Parliament favoured competition it was also aware that the ECR was constantly at war with its neighbours and whilst these working arrangements were approved there was a condition that a bill for full amalgamation was presented by 1861.
Waddington departed under a cloud in 1856 and was replaced by Horatio Love. By 1860 many shareholders were unhappy listing several grievances they saw as getting in the way of their dividend payments. These included continual conflict over working of other lines, suspicion and distrust of the joint committee, inadequate services to and from London, on-going litigation and law costs and a lack of progress on amalgamation.
By February 1862 the bill had its second reading and was then followed by a lengthy committee process where various parties petitioned against the bill. On 7 August 1862 the bill passed as the Great Eastern Railway Act 1862 (25 & 26 Vict. c. ccxxiii) and the Great Eastern Railway was formed by the amalgamation of the Eastern Counties Railway and a number of smaller railways (the Newmarket Railway, the Eastern Union Railway, and the Norfolk Railway).
Early years (1862–1869)
Unsurprisingly the first GER board had a strong Eastern Counties flavour with Horatio Love in the chair and James Goodson the deputy chair. The board consisted of six former ECR directors with two Eastern Union Railway, two Norfolk Railway and one each from the Northern and Eastern Railway (still an independent body at this point) and the East Anglian Railways.
Operational costs were high on the new railway and new sources of revenue needed quickly. Work at improving suburban services was put in hand and trains from London to Norwich speeded up to give businessmen and merchants more time to conduct their business. A new suburban line to Enfield Town via Seven Sisters was proposed as well as a new London terminus to replace an inadequate Bishopsgate. By August 1863 receipts were increasing and many of the pre-amalgamation disputes were being settled.
The GER and Great Northern Railway (GNR) each submitted bills for a line from March to Spalding and although the GNR was successful the GER was awarded running rights over the new line which would later become part of the Great Northern and Great Eastern Joint Railway. Steamboat services were also seen as a new source of revenue with services running from Harwich to Rotterdam, Flushing and Antwerp.
A change of leadership also occurred with Horatio Love being replaced by James Goodson as chairman with Captain Henry Jervis-White-Jervis as his deputy. Love was considered too cautious and some on the board still resented his role prior to amalgamation at the ECR. Various directors were allocated specific responsibilities (generally running these through committees) leaving Goodson free to develop new schemes and represent the GER on lines where they had a financial interest.
Following an accident at North Wootton in early August 1863, where the deaths of five passengers was partially attributed to the poor state of the rolling stock, a large rolling stock order was placed.
Read the full text
By December 1863 the financial picture was looking better and in early 1864 the GER started looking a new railway to move coal from South Yorkshire to London via Spalding and the GNR link from Spalding to March. The Great Eastern was clearly in an expansionist phase with further locomotives (forming the basis of standardisation over its disparate inherited fleet), carriages and wagons under construction. More ships were being ordered for Antwerp and Rotterdam traffic and proposals for 28 miles of new metropolitan lines and a new city terminus.
In March 1864, a joint committee of the House of Commons and House of Lords approved the East London Line which would link the North London, Great Eastern and London and Blackwall railways. The parliamentary bill for the new freight line failed although other bills including the construction of a new London terminus were approved. Later that year the GER was in talks about expansion northwards with the Lancashire and Yorkshire Railway (L&YR) which lead to the deposition of a bill in early 1865.
The board meeting of February 1865 saw passenger receipts outstripping goods receipts. Fish traffic from Lowestoft and Great Yarmouth was growing and money was being spent on stations, replacing wooden bridges and upgrading the track. However, a number of shareholders voiced concern. The following month the House of Commons rejected the joint GER/L&YR bill forcing the GER to restart negotiations with the Great Northern Railway. The chairman of the parliamentary committee suggested to the board that the next bill should include a direct Spalding to Lincoln link.
Board unity was about to be shattered when a short paragraph in The Times reported serious differences of opinions existed between the directors. In August 1865 deputy chairman Jervis-White-Jervis issued an appeal raising concerns about the management of the railway. This prompted an internal investigation and in a board meeting at the end of the month, an absent Jervis-White-Jervis was replaced by William Shaw as deputy chairman. The internal investigation concluded that many of Jervis-White-Jervis's concerns were relevant including borrowing more money than authorised and the poor deal the GER got on leasing the London and Blackwell Railway. In a meeting in January the following year many of the directors were duly replaced (by members of the investigating committee) and at the following board meeting in February, Charles Turner was elected as the new chairman.
The new board, facing a financial crisis, had identified a number of issues including the provision of a new terminus station at Liverpool Street, Bishopsgate (the existing terminus) was to be converted to a goods terminal and a new coal depot to be built in Whitechapel. The financial environment was still proving difficult with losses on the London and Blackwell line and a cattle plague seriously affecting that traffic. By March the board was meeting most days in an effort to keep the railway running.
The financial crisis of 1866 saw loan interest rates rise to 10% on 12 May. On 8 June the board approached Parliament for the right to borrow more money and raise additional money through new shares to fund the expansion programme outlined above. This was confirmed on 4 July. By this time there was little money available for dividends and the company looked very carefully at their expansion programme and unprofitable branch lines. By December 1866 little interest was being shown in the new shares, so the board went unsuccessfully to the Bank of England and Union Bank for further loans. The GER did, however, manage to agree running rights via the Great Northern Railway as far as Wakefield and with the Manchester, Sheffield and Lincolnshire Railway to interchange traffic at Lincoln and Retford.
The crisis continued into 1867 and by March it was apparent that the preference share payments due in April could not be paid. The board also received a letter from the drivers seeking improved working conditions. Additionally The Times suggested the GER may be about to appoint a receiver. Early April saw daily negotiations with the Union Bank although agreement was reached with the drivers by the middle of that month.
May saw the company trying to raise further funds via a parliamentary bill. However, by 25 June the House of Lords had rejected the bill and the board took steps to protect the company's property from its creditors. Matters were hardly helped when deputy chairman Samuel Laing resigned to become the chairman of the London, Brighton & South Coast Railway on 1 July. On 2 July a suit was bought before vice-chancellor Sir Richard Malins and the GER was placed into chancery.
Regrouping after this, the board pursued Edward Watkin, an MP with many other railway interests, as chairman. He did advise that the board that it needed to reconstitute itself in order to rebuild confidence in order to acquire new capital. Some existing members of the board were not pleased with this and it was not until 3 January 1868 that a reduced board of eleven members met with six new members including Watkin and Viscount Cranbourne MP who was elected as the new chairman.
The new directors were all allocated specific roles and a number of changes were made to reduce costs and improve profitability. Cranbourne also approached the London and North Western Railway to report on the state of the permanent way and rolling stock. By August 1868 the tide was turning with increased receipts and some debts being paid off. The GER had done a deal with the Midland Railway to route their coal traffic via their lines and a new coal depot at Whitechapel opened in December further improving profitability.
By August 1869 the financial position had improved enough to restore a dividend and this was whilst the Walthamstow line (now the Chingford branch line) was under construction. In the same month, deputy chairman Charles Turner resigned due to suspected fraud which was to lead to his bankruptcy later in the year. Although proceedings were initiated no prosecution resulted.
A new London terminus (1870–1879)
The original London terminus was opened at Shoreditch in east London by the Eastern Counties Railway (ECR) on 1 July 1840 when the railway was extended westwards from an earlier temporary terminus in Devonshire Street, near Mile End. The station was renamed Bishopsgate on 27 July 1847.
The Great Eastern attempted to obtain a West End terminus, alongside the one in east London, via the Tottenham and Hampstead Junction Railway, formed by an act of Parliament, the Tottenham and Hampstead Junction Railway Act 1862 (25 & 26 Vict. c. cc) of 28 July 1862. Plans to extend the western end of this line via a proposed 'London Main Trunk Railway', underneath Hampstead Road, the Metropolitan Railway (modern Circle line) and Tottenham Court Road, to Charing Cross, were rejected by Parliament in 1864.
A new London terminus at Liverpool Street was opened to traffic on 2 February 1874, and was completely operational from 1 November 1875. From this date the original terminus at Bishopsgate closed to passengers, although it reopened as a goods station in 1881.
1900–1914
In 1902 the Northern and Eastern Railway was finally absorbed by the GER, although it had been worked by the Eastern Counties Railway under a 999-year lease taken on 1 January 1844 whereby the Eastern Counties Railway would work the Northern and Eastern Railway in return for an annual rent and division of the profits.
Despite several half-hearted attempts by the GER during the latter part of the nineteenth century, it was the Midland Railway (MR) that finally bought the London, Tilbury and Southend Railway (LT&SR) in 1912 with the MR offering a better deal for the LT&SR shareholders than the GER ever had. The agreement was ratified by the LT&SR shareholders on 26 June 1911. During the following parliamentary session, the Midland Railway (London, Tilbury and Southend Railway Purchase) Act 1912 (2 & 3 Geo. 5. c. c) allowing the takeover by the MR was passed on 7 August 1912 although it was legally backdated to 1 January 1912. At the time of the sale the LT&SR was one of the most prosperous railways in the UK but too small to fund the changes it needed to make.
In 1914 the GER became the first UK railway company to employ a general manager from overseas, Henry Worth Thornton. He had previously worked as the General Superintendent of the Long Island Railroad in the USA.
During the First World War 1914–1918
The Railway Executive Committee was set up in 1912 after an incident between France and Germany in the Moroccan Port of Agadir and would take directions from the military and liaise with the railway companies. As it adjoined the North Sea the GER undertook a significant role in the war.
Had there been an invasion then the railways had evacuation plans for the civilian populations. The GER did require some upgrading to deal with the increased levels of traffic – lines were doubled, additional passing loops provided, platforms extended and watering facilities improved (for both the iron and more conventional horses). A number of link lines were provided including the link between the Tottenham and Hampstead at Gospel Oak to the Midland Railway and between the T&HJR and Great Northern Railway at Crouch Hill, Both links remain part of the national network in 2019.
When the war started several jobs fell to the railway – reserve troops and naval personnel had to be returned to their units and this saw an upsurge in usage of normal services. Various units were moved to the coast for defensive purposes and at the same time the government had started buying horses throughout the area leading to additional trains. There were also then the units that were being moved to the front line. The Royal Navy was using coal as its primary source of propulsion and additional coal trains would have been operated through the area as well.
In August 1914 the Germans disguised a passenger steamer (the Königin Luise) in GER colours and deployed it as a minelayer. This ruse was spotted on 5 August 1914 and the ship sunk by the British light cruiser HMS Amphion and destroyers HMS Landrail and HMS Lance.
The GER employed significant numbers of women during this period as many men had joined the army.
By 1916 unnecessary travel was being discouraged to conserve coal supplies.
The company set up a section dedicated to the movement of military traffic and between 1914 and 1918 nearly 10.5 million men were moved on GER services as well as significant numbers of horses and supplies. Specific military traffic was generated at Brimsdown, Ponders End and Stowmarket. Because of attacks on east coast shipping, traffic previously moved by sea was also carried on the GER (and more specifically the Great Eastern and Great Northern Joint Railway).
The GER also suffered from a number of Zeppelin attacks with, amongst others, the dormitory at Stratford engine shed and the royal shelter at King's Lynn both being hit.
After the First World War (1918–1923)
In 1922, a large marble memorial was installed at Liverpool Street station commemorating GER staff who had answered the call of duty to fight but died in action in the First World War. The memorial was unveiled by Sir Henry Wilson, who was assassinated by two Irish Republican Army gunmen on his way home from the unveiling ceremony. A smaller memorial to Wilson was later placed adjacent to the GER memorial, alongside one to Charles Fryatt, a British mariner who was executed by the Germans for attempting to ram a U-boat in 1915.
The Great Eastern name has survived, being used both for the Great Eastern Main Line route between London and Norwich, and also for the First Great Eastern train operating company which served much of the old GER route between 1997 and 2004.
1862 to 1880
Sinclair's first design for the GER was the W class single drivers built between 1862 and 1867 by a number of engineering firms. Two of these locomotives were rebuilt from the 2-2-2 to a 4-2-2 configuration later in their lives and these two, plus one of the original locomotives, carried a canary yellow livery. Another member of this class carried a cream livery "encircled by garlands of roses" when it was used to haul a special train in 1863 for the Prince and Princess of Wales (Edward VII and Queen Alexandria) after their marriage at Westminster Abbey. These locomotives were responsible for running express services on the Great Eastern and in later life worked the Cathedrals Express to Lincoln and York.
Scrapping began in 1883 with the last two locomotives being withdrawn in 1894. The only other classes of locomotive that Sinclair designed were a 2-4-0T class of five engines built for the North Woolwich line and a class of 2-4-2T engines known as Scotchmen because they were built by Neilson, Reid & Co of Glasgow. Both classes entered service in 1864/65.
Generally Great Eastern locomotives carried a pea-green livery with black lining at this time.
When Johnson took over as CME, the GER was so short of locomotives that he persuaded the North British Railway to let the GER have five locomotives of a 2-4-0 class being built by the Neilson, Reid & Co for them on loan. These formed the basis of the 40 strong 'little Sharpie' (or Number 1) class, with 10 being built by Stratford Works and the other 30 by Sharp Stewart hence the nickname. The GER was working many trains on the London Tilbury and Southend Railway at this time and the Sharpies were deployed on this traffic. The last two were withdrawn in 1913.
The next Johnson class was an 0-6-0 goods engine (Class 417) introduced in 1867 and 1868 and numbering 60 engines. A number of these engines had hinged chimneys for use through Silvertown tunnel on the North Woolwich line which had limited headroom. Scrapping began in 1888 with the final locomotive withdrawn in 1899.
Another more powerful 0-6-0 design followed in 1872/3 and was known as the 477 class. Introduced in 1872 and 1873, this 50-strong class was built by 5 different companies, and was notable for being the first GER engines with a six-wheeled tender. All were withdrawn between 1898 and 1902.
The growth of London suburban traffic saw a requirement for additional tank engines. The GER borrowed some Metropolitan Railway A Class 4-4-0T engines in the early 1870s and had 15 T7 class 0-4-2T engines built, followed by some 0-4-4T engines, one of which was the first locomotive to carry the distinctive GER Royal Blue livery.
The final locomotives introduced by Johnson were two C8 class 4-4-0 locomotives which were built with no engine brakes and no dedicated tenders. These locomotives, numbers 305 and 306, were frequently used on royal trains and finished their careers as station pilots at St Pancras and Liverpool Street.
The 0-4-4T 61 class was the first Adams engine, and these 50 engines were built for suburban traffic. Ten 0-4-2T locomotives (Class 61) followed between 1877 and 1879 and these lasted until 1907. Adams next design was a 4-4-0 class known as Ironclads. Unfortunately these were not very successful on passenger traffic and were soon deployed on freight workings.
The next Adams locomotive was the first UK 2-6-0 locomotive built in 1877. Another failure, this class of 15 locomotives were withdrawn after a working life of eight years, mostly working coal traffic between Peterborough and London.
Adams was succeeded by Massey Bromley who made the decision that henceforth more locomotives would be built at Stratford Works. Up to this point only 80 had been built.
However Bromley's first class of 4-2-2 locomotives were built by Dubs and Kitson with 12 allocated to Stratford and four each to Norwich and Yarmouth sheds. One of these locomotives was later equipped with oil-burning capabilities, but the increasing demands of railway traffic saw these engines withdrawn by 1893 after a relatively short life. Bromley also designed an 0-6-0 class which lasted some 24 years in traffic. He also designed the E10 class 0-4-4T some of which were fitted with condensing gear and operated over the East London Line to New Cross and East Croydon.
1880 to 1922
Between 1880 and 1922 the Great Eastern produced some distinctive locomotives, and several of these have been preserved. Almost all of the Great Eastern's locomotives were, after 1880, built at Stratford Works and many lasted until the end of steam on the Great Eastern.
Express services on the GER were latterly in the hands of the Class S69 (LNER class B12) 4-6-0 locomotives. Designed by James Holden and also known as the '1500 class', these engines were built at Stratford Works (51 engines) and William Beardmore (20 engines). Ten engines were later built for the London and North Eastern Railway by Beyer Peacock, and it is one of these locomotives that is preserved today.
These locomotives were built to succeed the three classes of 4-4-0 employed by the GER on express services which were becoming heavier as the railways prospered. Classes S46, D56 and H88 (LNER D14, D15, and D16) were collectively nicknamed "Claud Hamiltons" because the first S46 (built at Stratford in 1900, numbered 1900) was named after the then-current chairman of the GER, Lord Claud Hamilton. Most of the "Clauds" were later rebuilt by the LNER; the final one was withdrawn in 1960 and scrapped.
Local suburban traffic was dealt with by numerous 2-4-2T and 0-6-0T locomotives belonging to several different classes. Stratford Engine Shed, for instance, had 163 2-4-2T engines of four classes. As trains got heavier, these locomotives were replaced by the Class L77 0-6-2T (LNER N7) designed by Alfred John Hill and introduced in 1915. 134 were built, including a number after the LNER took over in 1923; one is preserved. The 2-4-2Ts, of which none survive, were mostly cascaded out of suburban traffic by the 1940s and worked until the late 1950s on branch lines.
Mention should also be made of the T26 (LNER E4) 2-4-0s, which remained in service as the last locomotives of this wheel arrangement in Great Britain. Derived from the larger T19 2-4-0, 100 of these locomotives were built between 1891 and 1902 and worked a variety of trains across East Anglia. The last one, GER no. 490, was preserved as part of the National Collection when withdrawn in 1959. Today it resides at Bressingham Steam Museum, Norfolk. Some of the T19s, incidentally, were rebuilt as 4-4-0s (class T19R) between 1905 and 1908, having been taken off express work by the "Claud Hamiltons". As LNER class D13, the last worked until 1944.
GER goods designs of this period were invariably 0-6-0 tender engines. The main freight class built by the GER was Worsdell's Y14 (LNER J15) 0-6-0 class. 289 examples were produced between 1883 and 1913 with most being built at Stratford Works, although a small number were built by Sharp Stewart. On 10–11 December 1891, the Great Eastern Railway's Stratford Works built one of these locomotives and had it in steam with a coat of grey primer in just 9 hours 47 minutes; this remains a world record. The locomotive then went off to run 36,000 miles (58,000 km) on Peterborough to London coal trains before coming back to the works for the final coat of paint. It lasted 40 years and ran a total of 1,127,750 miles (205,594 km). As freight traffic grew heavier after 1900, more 0-6-0 freight locomotives were built including classes F48 (LNER J16), E72 (LNER J18), G58 (LNER J17) and D81 (LNER J20); the Y14s, meanwhile, went into general local and branch line service, on both passenger and freight trains. The last Y14s ran until 1962, and no. 564 is preserved on the North Norfolk Railway; and G58 no. 1217 (withdrawn 1962) is in the National Railway Museum, York.
Shunting was generally in the hands of 0-6-0T locomotives although of note were the Class J70 tram engines employed at Ipswich docks and on the Wisbech and Upwell Tramway. This class of locomotive was later the inspiration of the Reverend Awdry's Toby the tram engine.
Finally mention must be made of the Decapod which was the first 0-10-0T built in Britain, and possibly the only locomotive built for purely political purposes in order to block the passage through Parliament of a new rival scheme for an electric railway.
From Wikipedia’s article on Great Eastern Railway, shared under CC BY-SA 4.0.4