Private company

Hellenic Railways Organisation

Logo: Philly boy92 , revised by Marianian to reduce file size, improve geometry, and make the code SVG compliant., Public domain, via Wikimedia Commons3

Defunct Greek railway infrastructure company

The Hellenic Railways Organisation or OSE (Greek: Οργανισμός Σιδηροδρόμων Ελλάδος, romanized: Organismos Sidirodromon Ellados or Greek: Ο.Σ.Ε.) was the Greek national railway company which owned, maintained and operated all railway infrastructure in Greece with the exception of Athens' rapid transit lines from 1971 to 2025. Services on these lines are run by Hellenic Train, a former OSE subsidiary, Rail Cargo Logistics Goldair, Pearl and Grup Feroviar Român.2 Wikipedia text CC BY-SA 4.0

Last updated Oct 20, 2026.

Overview

Jan 1, 1970Founded1
  • Industryrail transport1
  • HeadquartersAthens1
  • Websiteose.gr
  • Legal formjoint-stock company1
The headquarters of the Greek railway organization
Photo: athenswalk, CC0, via Wikimedia Commons5

The Hellenic Railways Organisation or OSE (Greek: Οργανισμός Σιδηροδρόμων Ελλάδος, romanized: Organismos Sidirodromon Ellados or Greek: Ο.Σ.Ε.) was the Greek national railway company which owned, maintained and operated all railway infrastructure in Greece with the exception of Athens' rapid transit lines from 1971 to 2025. Services on these lines are run by Hellenic Train, a former OSE subsidiary, Rail Cargo Logistics Goldair, Pearl and Grup Feroviar Român.2

Corporate structure

Hellenic Railways Organisation sits at the top of its group. 3 entities, 3 countries on record. Switch between the flow chart and the network, and select any entity to see its details.

  • Hellenic Railways Organisation Athens
    • Salonica–Constantinople Railway Company Subsidiary · Paris, Greece
    • EUROFIMA Stake · 2% · Basel, Switzerland
    • Aitoliko Railway Station Owned · Missolonghi Municipality, Greece
    • Alexandroupolis–Svilengrad railway Owned · Bulgaria
    • Athens Airport–Patras railway Owned · Greece
    • Kiato railway station Owned · Sikyona Municipality, Greece
    • Larissa–Volos railway Owned · Greece, Greece
    • Missolonghi Railway station Owned · Missolonghi Municipality, Greece
    • Olympia train station Owned · Ancient Olympia Municipality, Greece
    • P.A.Th.E./P. Owned · Greece, Greece
    • Piraeus-Patras railway Owned · Greece
    • Piraeus-Platy railway Owned · Greece, Greece
    • Promachonas railway station Owned · Sintiki Municipality, Greece
    • Thessaloniki–Bitola railway Owned · Greece

Built from subsidiaries, stakes and holdings from Wikidata (CC0); major holders from Schedules 13D and 13G. Each entity in the chart links to its source.

What it owns

What Hellenic Railways Organisation reports owning in its annual reports to the SEC: buildings, land and equipment, real estate and locations, investments, intangible assets and inventory, at the end of its latest fiscal year and a year before.

Stakes and holdings (Wikidata)

  • EUROFIMA 2%
  • Aitoliko Railway Station
  • Alexandroupolis–Svilengrad railway
  • Athens Airport–Patras railway
  • Kiato railway station
  • Larissa–Volos railway
  • Missolonghi Railway station
  • Olympia train station
  • P.A.Th.E./P.
  • Piraeus-Patras railway
  • Piraeus-Platy railway
  • Promachonas railway station
  • Salonica–Constantinople Railway Company
  • Thessaloniki–Bitola railway

Things Wikidata records the company as owning, with the share when stated.1

The story

Hellenis Railways Organisation was founded on 1 January 1971, with the Legislative Decree 674/1970, taking over the responsibilities as the successor to the Hellenic State Railways which had been founded in 1920. OSE is owned 100% by the Greek State. In 1996 ERGOSE was created within OSE to facilitate infrastructure projects. In 1999 The first section of the electrified line between Thessaloniki and Eidomeni is opened. Power is provided by an Overhead Contract System with 25 kV AC, 50 Hz.

In 2001, the infrastructure element of OSE was created, known as GAIAOSE. It would henceforth be responsible for the maintenance of stations, bridges and other elements of the network, as well as the leasing and sale of railway assists. In 2003, OSE launched "Proastiakos SA", as a subsidiary to serve the operation of the suburban network in the urban complex of Athens during the 2004 Olympic Games. In 2005, TrainOSE was created as a brand within OSE to concentrate on rail services and passenger interface. In 2008, all Proastiakos were transferred from OSE to TrainOSE. In 2013 ΕΕΣΣΤΥ, Stock Maintenance Company became a separate part of OSE responsible for both the maintenance of rolling stock and the leasing of it.

In December 2008 the Hellenic Republic Asset Development Fund became the sole shareholder of the corporation. A tendering process for the privatisation of TrainOSE began in July 2013. After a change in government the process was suspended in 2015, before recommencing in January 2016. Ferrovie dello Stato Italiane submitted the only binding offer, GEK Terna and Russian Railways submitted expression of interests but not formal offers.

On 14 July 2016, the privatisation agency accepted Ferrovie dello Stato Italiane's €45 million offer. The sale was completed on 14 September 2017. In 2019 Ferrovie dello Stato Italiane aquared ΕΕΣΣΤΥ As of December 2020, the Greek railway network consisted of 2,293 kilometres (1,425 mi) of active line length, some sections of which, such as the Peloponnese metric network, are used only in tourist seasons. The approximate length of the active network in permanent operation reaches 1,800 kilometres (1,100 mi)

On 5 September 2023, Storm Daniel triggered largescale flooding in Thessaly. The rail infrastructure was badly affected in the region, cutting off both Regional and Intercity routes as significant parts of the infrastructure were washed away. OSE engineers were on the ground in the worst affected areas Domokos, Doxaras, and Paleofarsalos to assess the extent of the damage, and prepare detailed reports, and seek financial assistance from the European Union.

50 km (31 mi) of tracks was completely destroyed Repairing the extensive damage, was estimated at between 35 and 45 million euros. OSE managing director, Panagiotis Terezakis, spoke of reconstruction works reaching 50 million euros, confirming at the same time that there will be no rail traffic in the effected sections of the network for at least a month. The devastation goes beyond the tracks and signalling, affecting costly equipment such as the European Train Control System (ETCS), which enhances rail safety. In November 2023, rail services resumed between Larissa and Rapsani after the devastating storm With Through services from Athens to Thessaloniki recommencing on 16 December 2023. However services between Larissa and Volos remain suspended across Thessaly's coast until the track is repaired, with a rail-replacement bus in operation.

In December 2024 it was announced that ERGOSE would merge back into OSE bringing together the responsible for managing railway infrastructure projects (particularly those co-funded by European Union) with managing railway assets, maintenance of stations and bridges, as well as the leasing and sale of railway properties into a single operational structure.

In 2025, a deal was reached for Deutsche Bahn to assist in modernizing Greece's railway system. Deutsche Bahn will support the operation and improvement of parts of the Greek rail network, contributing technical expertise, staff training, and operational guidance. The agreement follows Greece's efforts to enhance railway safety and infrastructure after a major train accident in 2023 and is part of an initiative to strengthen public transport systems across member states. The cooperation includes the deployment of German railway specialists and engineers to Greece, where they will assist in improving rail services and operations.

Read the full text

In August 2025, the Greek Ministry of Infrastructure and Transport confirmed the creation of a new body, Greek Railways (Greek: Σιδηρόδρομοι Ελλάδος, romanized: Ellinikí Sidiródromi Monoprósopi) to assume responsibility for rail infrastructure, planning, modernisation projects, and rolling stock across Greece. Previously, these functions were divided among several state-owned entities: OSE, which managed infrastructure; ERGOSÉ, responsible for modernisation projects; and GAIAOSÉ, which owned stations, buildings, and rolling stock. OSE had overseen both infrastructure and operations until its vertical separation in 2005. Rail safety has been identified as a key priority. The merger follows the July approval of a Parliamentary Bill to restructure the national railway system, a direct response to the Tempi accident of February 2023, in which 43 people died after a head-on collision.

From Wikipedia’s article on Hellenic Railways Organisation, shared under CC BY-SA 4.0.4

Products and brands

Branding

Early Years (1960s–1980s)

Initially, OSE's liveries were functional and utilitarian, with a new Logo to represent the new company. The first logo of the Hellenic Railways Organization, was established 1970, featured a distinct and simple design reflecting the organization's purpose and identity. The original logo depicted a winged wheel, symbolizing speed, mobility, and the connection between technology and transportation, a common motif in railway insignias worldwide. This design was framed in a circular layout, often accompanied by the acronym "OSE" in Greek letters (ΟΣΕ) or full name in some instances. The choice of the winged wheel highlighted the organization's focus on modernizing Greece's railway infrastructure and enhancing its services. Most locomotives and rolling stock were painted in shades of green, reflecting a traditional European railway style. Steam Locomotives, where primarily black with white or silver detailing, consistent with global practices for visibility and maintenance ease.

Modernization Era (1980s–1990s)

During this period, OSE adopted blue and white liveries, aligning with the national colours of Greece. Passenger carriages often featured a white base with blue stripes. Diesel locomotives such as the Alco models began sporting blue with white or yellow detailing, while some electric units showcased variations of red, yellow, and silver.

2000s – Brand Consolidation

New OSE Logo and Branding of corporate logo was prominently displayed on rolling stock. The letters of the new logo incorporate interlocking and flowing curves, symbolizing connection and movement, which align with the concept of a railway network. The colours are a contrast to each other, with both the orange and the blue, making the logo visually dynamic and ensuring it stands out in various contexts. The designs became more streamlined, incorporating lighter blue and grey tones to reflect a modern image. High-speed Intercity (IC) trains were branded with more vibrant and passenger-focused liveries, including combinations of blue, white, and silver.

Post-Privatization Influences (2010s–2020s)

With the privatization of the passenger operator TRENOSE (now Hellenic Train under the Ferrovie dello Stato Italiane group), livery styles began to diversify. TRENOSE introduced its branding, emphasizing red, white, and silver, particularly on its modernized ETR 470 and other high-speed trains. The Freight locomotives continued with more subdued liveries, often red, blue, or gray. Under the management of Hellenic Train, OSE's infrastructure and rolling stock are gradually being updated. Liveries reflect modern corporate branding, often incorporating sleek designs and reflective of the Italian influence.

Read the full text

Primary rail network

As in most European Union countries, the administration of the railway infrastructure is separate from the railway operating companies using the network to provide passenger and freight transportation services. Up until November 2010, company EDISY S.A. was the actual manager of the Greek national railway infrastructure until it became a subsidiary of OSE. Specifically, on 29 November 2010, EDISY S.A. was merged back into the parent company OSE S.A., which is today the manager of the rail infrastructure of Greece.

The major lines of the Greek railway network consist of the mostly electrified standard gauge double-track line from Athens to northern Greece-Thessaloniki, a single-track electrified line from Thessaloniki to Idomeni (at the border with North Macedonia) and the mixed-gauge line from Athens to Peloponnese. Almost all other lines link directly with these two lines. The main line of the Greek Railway System from Athens to Thessaloniki covers a distance of 520 kilometres (320 mi).

According to the 2007 Network Statement, the total length of the standard gauge lines was approximately 1,665 kilometres (1,035 mi), while the length of the metre gauge lines (excluding Krioneri–Missolonghi–Agrinio line) is about 725 km (450 mi). In addition, about 150 km (93 mi) of new standard gauge lines towards Athens Airport and to replace metre gauge lines became fully operational in July 2007.

The backbone of the Greek railway network is called P.A.Th.E./P., which stands for Patras–Athens–Thessaloniki–Idomeni/Promachonas.

Piraeus – Athens Central Station

Piraeus is served by two terminals. One at Piraeus Harbour (Πειραιεύς Λιμήν, 37°56′55″N 23°38′08″E), which up until 2006 was used by some standard gauge trains for Chalkis, Thessaloniki, and Alexandroupolis. The short line to Agios Ioannis Renti is closed and, as of 2009, is being renovated. The heavy rolling stock repair works (Piraeus Central Factory, Κεντρικό Εργοστάσιο Πειραιώς – ΚΕΠ) are located at Lefka (37°57′17″N 23°39′03″E), next to Ergostasio halt, and are accessible from this line.

The other Piraeus mainline station (Peloponnese Station, 37°56′57″N 23°38′36″E) was used by the Peloponesse metric line trains until 2005, when it was converted to standard gauge, reopening in 2007 and today serving the Proastiakos rail service. The two lines from Piraeus meet just outside Agios Ioannis Renti (AIR) marshalling yard (37°57′41″N 23°39′55″E). Next to the marshalling yard lies the major rolling stock depot and maintenance facility of OSE (MAI).

North of AIR, the line crosses Kifissos River and then passes through the freight and parcels handling station of Rouf. At a siding of Rouf station, there is a "railway theatre" in disused rolling stock and a disused SEK class Μα "2-10-2" steam locomotive made by Breda (37°58′27″N 23°42′14″E). The line between Rouf and Athens Central (Larissis Station) is single-track and non-electrified.

There is considerable traffic on this stretch as it serves the busy Proastiakos commuter rail service and regional rail service to Thessaloniki and Halkida (Chalkis); as well as other destinations served by Athens.

Athens – Larissa – Thessaloniki

In 1916 the railway from Athens to Platy was completed, linking Athens with the European railway network. The line passes through Thebes and Larissa, and offers connections to several other cities (Chalcis, Lamia, Volos, Trikala) through branch lines. At Platy the line joins with the line from Thessaloniki to Amyntaio, Kozani, and Florina. The line continues across flatland until the suburbs of Thessaloniki are reached at Sindos.

Larissa and Thessaloniki have substantial marshalling yards for both goods and passenger trains.

There are daily InterCity (IC) trains from Athens to Thessaloniki and one night train. The InterCity (IC) rail service usually takes 4 hours and 23 minutes from Athens to Thessaloniki and 4 hours and 10 minutes from Thessaloniki to Athens.

Athens – Corinth – Kiato - Patras

In 2004, a new line was inaugurated running from Acharnai (SKA) junction to Athens International Airport "El Venizelos". Between Iraklio and Koropi, the new line runs along a closed motorway (Attiki Odos) along the general direction of the old Lavrio line, but displaced east. The line is double-track and electrified with 25 kV overhead catenary. When the planned extension from Koropi to Lavrio is built, it will probably follow the old Lavrio line more closely.

The new Corinth line branches off at SKA and runs west into Elefsis and the Megara Plains. The line passes through impressive tunnels and bridges in the "Kakia Skala" area, north of Agioi Theodoroi; while crossing the Corinth Canal over a new bridge and then into the New Corinth Station.

The line extends up to the village of Rodadaphni. Currently, the service is carried by DMU trains between Kiato and Aigio, where passengers can change to Hellenic Train bus services to Patras. Passengers in Kiato can also choose Hellenic Train bus services to reach Patras. There is work in progress to extend the line to Rio (Bozaitika area), while plans exist to extend the line to Patras.

Electrification of the lineup to Rio is in the plan as well.

Thessaloniki – Idomeni

This is a single-track electrified line connecting Thessaloniki with Idomeni, near the border with North Macedonia. It is mostly used for international freight.

Secondary rail network

Thessaloniki – Edessa – Amyntaio – Kozani / Florina

This line was opened in 1894 and connects Thessaloniki with the city Bitola, in the southern part of North Macedonia. It passes through Platy, Veroia, Edessa, Amyntaio, and Florina. At Amyntaio the Kozani–Amyntaio railway branches off. The section between Thessaloniki and Platy is part of the important connection towards Athens and southern Greece. The part across the border with North Macedonia is not used anymore, and passenger traffic has been suspended west of Edessa.

Thessaloniki – Alexandroupoli – Svilengrad

This railway line, 620 km long, joins Thessaloniki via the Port of Alexandroupoli to Svilengrad in Bulgaria, passing through or near most major cities of East Macedonia and Thrace (Serres, Drama, Xanthi, Komotini). At Strymon, the line connects with a northbound line along Strymon River Valley to Promachonas, which then joins with the Bulgarian network at Kulata. The line section from Stavroupoli to Toxotes runs along Nestos River Valley and is part of a preserved area that is not accessible by road.

From Alexandroupolis, the line continues northwards, where it runs alongside the Evros River, that marks the border between Greece and Turkey. A junction is located at Pythio, where a line continues east and crosses into Turkey towards Istanbul. On the Greek side, the line continues north over the Karaağaç cut off to Ormenio, the northernmost village of Greece. There the line crosses to the Bulgarian border town of Svilengrad. The distance from Alexandroupolis to Ormenio is 178 km.

Leianokladi - Stylida

An unelectrificated single-track regional railway line that connects Stylida with Lamia and Leianokladi.

Oinoi – Chalcis Line

The Oinoi–Chalcis railway is an 21.69-kilometre-long (13.48 mi) railway line that connects Oinoi (West Attica) with Chalcis, capital of Euboea in Greece. It is one of the most important railway lines in Central Greece. Its southern terminus is Oinoi, where there are connections to Athens and Thessaloniki.

Thessaly rail network

Larissa – Volos

The 1,435 mm (4 ft 8+1⁄2 in) standard gauge, single-track branch line from Larissa to the port of Volos (61 km) was completed in 1960 along the route of a former 1,000 mm (3 ft 3+3⁄8 in) metre gauge line. It branches off the Athens–Thessaloniki mainline at Larissa crossing the Northern part of the Thessalian Plain to Velestino, formerly a junction with the now disused Volos–Palaiofarsalos section. From Velestino it descends rapidly to the port of Volos, initially running parallel to the abandoned metre gauge line and then diverging through Melissiatika. Volos was the terminus for both lines, and also for the Pelion railway to Milies. Engine sheds and marshalling yards at Volos are home to many abandoned relics of the Greek railway system. There is a regular service on this line. Volos station is one of the very rare stations that serves three different gauges of railway line, notably standard gauge, metre gauge, and 600 mm (1 ft 11+5⁄8 in) gauge.

Palaiofarsalos – Kalabaka

The West Thessaly single-track line to Kalabaka, recently converted to 1,435 mm (4 ft 8+1⁄2 in) standard gauge, branches off the Athens–Thessaloniki mainline at Palaiopharsalos. The line serves the cities of Karditsa and Trikala, the towns of Sofades and Kalambaka; and the tourist attraction of Meteora. In the past, this line was part of a 1,000 mm (3 ft 3+3⁄8 in) metre gauge line from Velestino to Kalabaka, crossing the main line at Palaiofarsalos. The eastern section to Velestino, still metre gauge, is maintained by enthusiasts as a heritage railway.

Peloponnese metre gauge network

The Peloponnese network belonged since its construction to the former Piraeus, Athens and Peloponnese Railways or SPAP (Greek: Σιδηρόδρομοι Πειραιώς Αθηνών Πελοποννήσου, Sidiródromi Pireós Athinón Peloponnísou; ΣΠΑΠ) until 1962 when they were merged to Hellenic State Railways or SEK (Greek: Σιδηρόδρομοι Ελληνικού Κράτους, Sidiródromi Ellinikoú Krátous; ΣΕΚ).

All passenger service on the metre gauge network in the Peloponnese (except the Diakofto Kalavrita Railway) was suspended in 2011. Some special passenger trains were able to run by demand of tour operators with the last one in 2016 but the line as of 2025 needs repairs in order for trains to run again

Athens – Corinth – Kiato (metre gauge)

The old metre gauge Piraeus–Patras railway line of Piraeus, Athens and Peloponnese Railways, which ran from Piraeus, Athens to Corinth, used to remain in operation only between Agioi Anargyroi and Corinth for departmental and freight services after passenger services were shut down in 2007 but now is completely abandoned. The track from Piraeus to Agioi Anargyroi has been removed. It is double-tracked between Agioi Anargyroi and Elefsis (near Athens), while for the rest of its remaining section it is single-tracked and non-electrified.

After Ano Liosia, the line runs north and west of the Aegaleo mountain range into Eleusis and onwards to the Megara plain. After nine km it reaches Kakia Skala, running between the old and new highways. It then continues between the mountain and the sea, passing next to the Corinth Refinery, crossing the Corinth Canal into the Peloponnese and on into the Old Station in Corinth on the Southern banks of the Gulf of Corinth.

The part between Ano Liosia and Megara is currently under reconstruction in standard gauge and electrified using 25 kV 50 Hz AC.

A short branch line at Isthmos leads to the town of Loutraki. The branch is currently under reconstruction in standard gauge and electrified using 25 kV 50 Hz AC.

Kiato – Patras

The 1,000 mm (3 ft 3+3⁄8 in) metre gauge line to Patras runs along the south side of the Gulf of Corinth, the northern coast of the Peloponnese.

At Diakofto, a seaside resort between Corinth and Patras, there is a junction with the Diakofto Kalavrita Railway, a 750 mm (2 ft 5+1⁄2 in) gauge rack and pinion line which climbs to a height of 720 m during a 22 km journey to Kalavryta through the Vouraikos Gorge. This line is known to Greeks as the "Odontotos" ("The train with teeth").

The main line continues alongside the gulf, passing to the north of Aigio and on to Patras. The Patras train station is situated next to the port near Othonos-Amalias Avenue. An old steam locomotive, c. 1900, lies to the east. The engine sheds and rolling stock depot are located to the northeast next to Norman Street. A freight marshalling yard is near Agios Andreas, although there are no longer freight services on the metric line.

Services on this section were suspended on 17 August 2009 due to work in progress for the line regauging to standard gauge. Hellenic Train announced that services will be reinstated on the western part of the line (Diakopto-Patras) on 27 September 2009. As of 2025 Kiato railway station is the terminal for the electrified trains Siemens-Desiro class 460 as the line till Aigio railway station is not electrified yet but will soon be in 2026

Patras – Lechaina – Pyrgos – Olympia

The line Patras–Kato Achaia–Lechaina–Amaliada–Pyrgos–Olympia is about 150 km long and runs through the prefectures of Achaia and Ilia. The train runs to the east of Akti Dymaion and alongside the Gulf of Patras between the old and the new highways as far as Kato Achaia, where it passes along the bed of the ravine, 4 km from the EO9/E55 to Lappa. The route then runs to the north of forested land, passing into Nea Manolada, then west of the highway to Lechaina. There used to be a junction with the Kavasila–Kyllini/Loutra Kyllinis branch line here, but this branch has since been abandoned. The line continues southwest to Kardamas and then into Douneika, moving away from the hills before reaching Pyrgos. It passes Pyrgos to the north, shortly branching left to the south west, leaving the main line for Kyparissia and Kalamata. The track runs into the hills, passing through Varvasena and then into the terminus at Olympia.

Pyrgos – Katakolo

Another 13 km branch line, originally operated by a separate company Σιδηρόδρομος Πύργου–Κατακώλου (Pyrgos–Katakolo Railway), opened in 1883 to link Pyrgos with the port of Katakolo. This line had its own terminal in Pyrgos. Later, in 1951, this railway was taken over by SPAP and trains were diverted into the SPAP station. The line was modernised in 2007 and is used for limited passenger service.

Pyrgos – Kalo Nero – Kyparissia/Zevgolatio

The line runs along the bed of the Alpheus river, east of the EO9/E55, then through Zacharo and into the plain westward with a few forested hills northwest of Kaiafa. It runs for most of its length west of the highway, passing into Zacharo and through Neochori and Tholon. At Kalo Nero, the main line turns east and runs inland, joining Corinth–Argos–Tripoli–Kalamata line at Zevgolatio while a short branch continues south from Kalo Nero down the coast to Kyparissia.

Corinth – Argos – Nafplion – Tripoli – Kalamata

The line branches off from the Athens–Corinth–Patras line, one km west of Corinth Old Station, with a spur entering the Corinth New Station. The line passes through Argos, where there is a branch line of ten km from Argos to Nafplion. It continues on to Tripoli and Lefktro, where a short branch line connects Megalopoli to the main line. In Zevgolatio, the line joins the line from Pyrgos–Kyparissia and continues on to Kalamata. This line used to continue from the main station of Kalamata to the old station of "Kalamata Limin" (Kalamata Harbour), now used as an open-air railway museum, and it came to an end at the Port of Kalamata. The track of this last section from Kalamata main station to the port still exists but is no longer in use.

Work is in progress on this line, especially between Tripolis and Kalamata, and details are liable to change. Passenger services on the section between Corinth, Argos, Tripolis, and Nafplion resumed on 1 August 2009 only to stop again 2 years later in 2011 with the whole line

Messene – Kalamata

This single-track line is a branch of the Corinth–Argos–Tripoli–Kalamata line and is 4.7 km long. The branch starts at Asprochoma then the track follows the EO82 road closely on the southern side. The line was opened in 1892 and linked Kalamata with Messene where a station building and a freight yard were built. It was closed in 1976, but the tracks were not removed.

The line was rebuilt and reopened in September 2007. From 2013 to 2016, there was an occasional operation, from 20 until 28 September, during the Messene festival and to the Christmas period until 10 January.

Since 10 June 2025, there has been an effort in the Kalamata municipal council to restore the Kalamata - Messinia part of the line. The Municipal government wishes for the line to connect the port of Kalamata, Kalamata International Airport, the Courts and finally Messini. The vice-mayor supported the plan and wished to install traffic lights should construction be implemented finishing to say that by the end of 2025 3km of the line will have been completed. The local KKE-backed Councillor claimed that the shutting down of the train tracks is one of the most destructive decisions made.

From Wikipedia’s article on Hellenic Railways Organisation, shared under CC BY-SA 4.0.4

Subsidiaries and ownership

Also owns

  • EUROFIMA 2%
  • Aitoliko Railway Station
  • Alexandroupolis–Svilengrad railway
  • Athens Airport–Patras railway
  • Kiato railway station
  • Larissa–Volos railway
  • Missolonghi Railway station
  • Olympia train station
  • P.A.Th.E./P.
  • Piraeus-Patras railway
  • Piraeus-Platy railway
  • Promachonas railway station
  • Salonica–Constantinople Railway Company
  • Thessaloniki–Bitola railway

From Wikidata.1

Acquisitions

  1. Succeeded Hellenic State Railways1
  2. Succeeded by Greek Railways1

Timeline

  1. Jan 1, 1970Founded Founded1