What Lithium Americas reports owning in its annual reports to the SEC: buildings, land and equipment, real estate and locations, investments, intangible assets and inventory, at the end of its latest fiscal year and a year before.
The information on the Company’s primary asset, Thacker Pass, contained in this Form 10-K Item 2: Properties section has been derived from the Reports, is subject to certain assumptions, qualifications and procedures described in the Reports, some of which are not fully described herein, and is qualified in its entirety by the full text of the Reports.
Reference should be made to the full text of the Reports, effective December 31, 2024, which is filed as Exhibit 96.1 to this Annual Report and incorporated by reference herein. The S-K 1300 Technical Report is also available for viewing on the Company’s profile on EDGAR at www.sec.gov. The NI 43-101 Technical Report is also available for viewing on the Company’s profile on SEDAR+ at www.sedarplus.ca. All capitalized terms used in the disclosure below that are not otherwise defined shall have the meanings ascribed thereto in the Reports, as applicable.
The rest of Item 2
The following description is taken from the Reports, and also includes certain information updated from the time of the filing of the Reports in accordance with the requirements of S-K 1300. For developments subsequent to December 31, 2025, refer to Part I – Item 1: Business – Organizational History and Recent Developments in this Form 10-K.
Thacker Pass Summary
In April 2025, the final investment decision was declared and Thacker Pass proceeded with major construction of the processing plant. For an overview and update on construction progress, refer to Part I – Item 1: Business – Thacker Pass Overview in this Form 10-K. As of December 31, 2025, approximately 150 acres have been disturbed at Thacker Pass in connection with construction activities. Among other things, construction is focused on the lithium processing facility and sulfuric acid plant, in addition to the development of permanent roads and entryways.
Thacker Pass is currently owned by a JV between LAC, which has a 62% ownership, and GM, which has a 38% ownership (in each case, subject to the exercise of the JV Warrant). On January 30, 2026, the Company issued the JV Warrant to the DOE, which have not been exercised as of the date of this Form 10-K. For more information on the JV, refer to Part I – Item 1: Business – Organizational History and Recent Developments in this Form 10-K.
Refer to Item 1A: Risk Factors for risks related to Thacker Pass.
Technical Report
The primary purpose of the Reports was to provide an update of the Mineral Resource and Mineral Reserve estimates to incorporate data from 97 drills completed in 2023. The updated Mineral Reserve supported an expansion plan across five phases for total designed nominal capacity rate of approximately 160,000 t/y of lithium carbonate over an 85 year mine life. The Reports also included estimated capital costs, operating costs, reclamation and closure costs, royalties, taxes and economic analysis, as well as current status of the permits.
Property Description and Location
Thacker Pass is located in Humboldt County in northern Nevada, approximately 100 km north-northwest of Winnemucca, approximately 33 km west-northwest of Orovada, Nevada, and 33 km south of the Oregon border. It is situated within Township 44 North (T44N), Range 34 East (R34E), and within portions of Sections 1 and 12; T44N, R35E within portions of Sections 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, and 17; and T44N, R36E, within portions of Sections 7, 8, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, and 29. The Project area is located on the United States Geological Survey (USGS) Thacker Pass 7.5-minute quadrangle at an approximate elevation of 1,500 m. Entrance to the Project can be found at 41o 41’ 40.6” N 118o 02’ 4.3” W.
The Thacker Pass area encompasses approximately 7,900 ha and lies within and is surrounded by public lands administered by the BLM. The Thacker Pass mineral claims include the anticipated lithium claystone mining at the Thacker Pass deposit along with certain ancillary surface rights; the claims encompass an area previously referred to as the Stage I area of the Kings Valley Lithium Project. The surrounding area is sparsely populated and used primarily for ranching and farming.
Access to Thacker Pass is via the paved US Highway 95 and paved State Route 293; travel north on US-95 from Winnemucca, Nevada, for approximately 70 km to Orovada, Nevada and then travel west-northwest on State
Route 293 for 33 km toward Thacker Pass to the Thacker Pass site entrance. Driving time is approximately one hour from Winnemucca, and 3.5 hours from Reno. On-site access is via several gravel and dirt roads off of State Route 293. The closest international airport is located in Reno, Nevada, approximately 370 km southwest of Thacker Pass. The nearest railroad access is in Winnemucca, Nevada.
As at December 31, 2025, the net book value for the Thacker Pass property was $1,328.6 million.
Mineral Tenure
Thacker Pass is comprised of 2,829 unpatented mining claims and 39 mill site claims (together, the “Thacker Mining Claims”) owned or controlled by LN. LAC also owns 64.75 ha of private property in the Project area. LN and its affiliate KV Project LLC are the record owners of the Thacker Mining Claims and LAC’s unpatented mineral claims in the Montana Mountains.