A formal opening of the first part of the line took place on 17 July 1832; a passenger journey for proprietors and directors and their friends only, ran from the West Bridge terminus in Leicester to the summit level at Staunton Road crossing, a distance of 11 miles 55 chains (19 km). The inaugural train was drawn by the locomotive Comet and consisted of an open wagon specially covered in for use of the directors, the company's only open second-class carriage and ten new coal wagons with improvised seats, conveying in all about 400 passengers. It left West Bridge at 10:00 and reached Bagworth at 11:00 "A slight delay was caused by the engine chimney striking the roof of the tunnel at a point where the platelayers had temporarily raised the track to pack a 'low' place. The train was halted specially at Glenfield Brook to enable the passengers, especially the ladies, to remove the effects of the enforced sojourn in the tunnel." The return journey conveyed two wagons of coal in addition.
The general public were able to travel to Bagworth and back by a second special train at 16:30. On the next day, the ordinary train service started; this usually consisted of three empty wagon trains each weekday, leaving West Bridge at 08:00, 13:00 and 16:30; the passenger carriage was attached to these and the corresponding return loaded trips. Apparently, special passenger trips were run for a few weeks after opening, until the novelty of a train journey had worn off.
At first only Bagworth colliery was connected to the line, and accordingly income from mineral traffic was far below what was planned. Pressing ahead with the construction of the northern section of the authorised line was called for. In addition, a rebate was offered to other coal owners whose workings were near to the open section but not connected by rail; the rebate was in recognition of the cost of road transport from those pits to the railway, and of the breakage of coal due to the additional transhipment. The rebate proved very effective and those pits forwarded considerably increased quantities.
The usual train consisted of twenty-four wagons of 32 long hundredweight (1.6 t) each. The idea that there would be a demand from passengers came as something of a surprise to the directors, but a carriage was hastily built, and very soon the line was carrying about 60 passengers a day and their fares were repaying one per cent of the capital. In time, both first and second class was provided. On payment of the fare at the departure station, each passenger would receive a metal token marked with the destination. This would be given up on arrival and reused. Small four-wheeled wagons and coaches, painted plain blue, comprised the rolling stock.
Read the full text
For many years facilities for passengers remained primitive; tickets were procured at local inns; passenger carriages were attached to goods trains. At West Bridge carriages were drawn into a siding by horses once they had been detached from the goods wagons. It was well into the 1870s before a platform was provided, and the conveyance of passengers at the rear of coal trains continued until 1887. From that time the Midland Railway supplied a proper branch train of six-wheel carriages hauled by a Midland 0-6-0 tender locomotive.
Permanent way problems
The cross-sleepers were found to cause difficulties, especially in cuttings, and some sections were replaced with stone blocks. However the stone blocks required constant packing to maintain line, level and gauge, and were considered to be harder riding than timber sleepers. Nevertheless, some of the stone blocks continued in use until at least 1885.
Further opening
The remainder of the line from Staunton Road to Ashby Road opened on 1 February 1833 or a few days before that. From Ashby Road to Long Lane, Coalville, was opened on 22 April 1833 for coal traffic and on 27 April 1833 for passengers, completing the intended extent of passenger operation, as from that point to Swannington would be used for mineral traffic only. The continuation to Swannington probably opened at the end of November 1833.
Soar Lane, Leicester
There had previously been plans to extend at Leicester across the Leicester Canal to Soar Lane. The decision was taken to revive the Soar Lane branch on 22 October 1832. On 10 June 1833 the necessary powers were secured in the Leicester and Swannington Railway Act 1833; an opening bridge was required over the Leicester Canal. The branch was brought into use on 4 October 1834.
Bagworth incline operation
The Bagworth incline was 43 chains in length and the gradient 1 in 29. It was self-acting: the loaded wagons descended by gravity, pulling up the lighter, empty ones by means of a hemp rope. The rope passed around a large horizontal pulley at the top. When a train from Leicester arrived at the Bagworth station at the foot of the incline, the locomotive was detached and the empty wagons connected to the rope. The loaded waggons had been brought by another locomotive to the top, and they were attached to the other end of this rope. Their greater weight pulled the empty ones to the top. In the middle of the incline there was a passing place and from this loop to the top there were three rails, the centre rail being common to both up and down movements; the object of this was to account for the width of the wheel and the position of the rope. 10 or 12 loaded waggons of about 6 tonnes each were run down at one time the descent occupying eight or nine minutes.
Locations
Following stagecoach practice, formal station buildings were not provided at first; the stations were merely stopping points.
Leicester opened 18 July 1832; West Bridge soon added to name; replaced 13 March 1893 by station known locally as King Richard's Road; closed 24 September 1928;
Glenfield; opened 18 July 1832; resited east of level crossing 1875; closed 24 September 1928;
Ratby Lane; opened 18 July 1832; renamed Ratby by 26 April 1833; resited west of level crossing 1873; closed 24 September 1928;
Desford Junction; convergence of Midland Railway new line;
Desford Lane; opened 18 July 1832; renamed Desford by 26 April 1833; resited about 150 yards west 27 March 1848; closed 7 September 1964;
Merry Lees; opened 18 July 1832; soon renamed Merrylees; resited 150 yards west of road overbridge 27 March 1848; closed 1 March 1871;
Stag & Castle; opened 18 July 1832; renamed Thornton 1841; closed 1 January 1842;
Thornton Lane; opened 1850; on deviation line; closed 1 October 1865;
Bagworth; opened 18 July 1832; closed 27 March 1848 when new station on deviation opened;
Bagworth; opened on deviation line 27 March 1848; renamed Bagworth & Ellistown 1 October 1894; closed 7 September 1964;
Bagworth Incline House 'stopping place'; 3⁄4 mile beyond Bagworth; opened 18 July 1832; probably soon closed;
Bagworth Staunton Road; original terminus of service opened 18 July 1832; ceased to be a calling point when line extended, 27 April 1833;
Ashby Road; opened 22 February 1833; limited service; opened fully 27 April 1833; renamed Bardon Hill 1 January 1847; closed 1 March 1849; reopened 1 September 1849; closed 12 May 1952;
Long Lane; opened 27 April 1833; renamed Coalville 1848; renamed Coalville Town 2 June 1924; closed 7 September 1964;
Mantle Lane Junction; divergence of Midland Railway line to Burton;
Swannington.