The story
1959 ― The start of construction.
1963 ― January 18, the opening of the first line for production of sulfuric acid. In September of that year, the second line opened.
1963 ― In December, started production of powder and granular super phosphate.
1964 ―The launch workshop on the production aluminum fluoride, the third line for production of sulfuric acid.
1968 ― The shop for the production of phosphoric acid and Ammophos.
1970 ― second shop for the production of granulated super phosphate.
1972 ― The start of production of extruded mixtures of phosphorus-potassium fertilizer combination in the shop (before 1990.)
1973 ― In December, the fourth line for production of sulfuric acid.
Read the full text
1982 ― The opening of the second workshop on the production of phosphoric acid (the old closed for renovation.)
1984 ― New shop for aluminum fluoride (old closed.)
1985 ― Was opened after reconstruction of the first workshop of phosphoric acid.
1986 ― Built and launched a third line production of Ammophos.
1988 ― In the autumn the plant has passed the first congress of the Lithuanian Greens. As a result of their demands obsolete lines of sulfuric acid production were closed. After closure, where was sharp reduction in the lung cancer cases in the surrounding area. Introduction of new, modern sulfuric acid line.
1996 ― The privatization of the enterprise.
2001 ― The start of production of dicalcium phosphate.
2002 ― Starts production of mono-calcium phosphate.
2002 ― The majority share package was acquired by Swiss company EuroChem.
2004 ― Starts production of monodicalcium phosphate production.
2007 ― AB "Lifosa" implemented the Project "Utilization of local and recovered process heat at the sulphuric acid unit in power generation process", completed the installation of the Heat Recovery System HRS. The system enables to produce more heat and electricity by more efficiently utilizing the sulphuric acid process heat. The EU structural funds granted the support to this Project.
2010 ― The Company invested more than 90 million LTL into the construction of new objects and launching of new equipment and significantly increased the production capacity.
2010 ― The longest transporter in Lithuania (880 meters) was built.
2012 ― the construction of the multifunctional sports and entertainment complex "Kedainiai Arena" was started. The construction of this complex was financed by AB "Lifosa", the investment amounting to appr. 17 million LTL. Kedainiai Arena was opened August 2013. This was the present of AB "Lifosa" to the city.
2013 ― AB "Lifosa" invested 77.4 million LTL into new technologies and environmental protection projects.
2014 ― The new converter was installed in Sulphuric acid plant. It made possible to increase the conversion of SO2 (contacting) degree from 99.7% to 99.9%.
2017 ― New production plant of soluble crystalline mono-ammonium phosphate (MAP) was started, having the design production capacity of 30 thousand tons per year.
2018 ― This year, the company will start to produce another type of completely soluble fertilizer ― urea phosphate.
2021 ― in January, a 1 MW solar power plant was opened at the phosphorus fertilizer factory.
From Wikipedia’s article on Lifosa, shared under CC BY-SA 4.0.5