The story
Formation
The LMS was formed from the following major companies:
Caledonian Railway 1,114.4 miles (1,793 km) route length
Furness Railway 158 miles (254 km)
Glasgow and South Western Railway 498.5 miles (802 km)
Highland Railway 506 miles (814 km)
London and North Western Railway (including Lancashire and Yorkshire Railway, amalgamated 1 January 1922) 2,667.5 miles (4,292.9 km)
Midland Railway 2,170.75 miles (3,493 km)
North Staffordshire Railway 220.75 miles (355 km)
Read the full text
There were also some 24 subsidiary railways, leased or worked by the above companies, and a large number of joint railways, including the UK's largest Joint Railway, the Midland & Great Northern, and one of the most famous, the Somerset & Dorset. The LMS was the minority partner (with the LNER) in the Cheshire Lines Committee.
In Ireland there were three railways:
Dundalk, Newry and Greenore Railway 26.5 miles (42 km)
Northern Counties Committee 265.25 miles (426 km)
Joint Midland and Great Northern of Ireland Railway 91 miles (146 km), with interests in Ireland
All of the above operated, at least partially, in Northern Ireland
The total route mileage of the LMS in 1923 was 7,790 miles (12,537 km).
Early history
The early history of the LMS was dominated by infighting between parties representing its constituent parts, many of whom had previously been commercial and territorial rivals. This was particularly marked in the case of the Midland and the North Western, each of which believed its way was the right – and only – way of doing business. This rivalry was so severe, that stories of connecting trains at Birmingham New Street from the previous LNWR and MR parts of the system, being deliberately made to miss each other persisted even as late as the early 1950s, long after their demise. Many of the senior appointments on the operating side were of former Midland men, such as James Anderson, so that Midland ideas and practices tended to prevail over those of other constituents. For example, the Midland's system of traffic control was imposed on a system-wide basis, along with the Midland livery of Crimson Lake for passenger locomotives and rolling stock. Particularly notable, especially after the appointment of Sir Henry Fowler as Chief Mechanical Engineer, was the continuation of the Midland Railway's small-engine policy (see Locomotives of the Midland Railway).
The LMS also implemented a novel management structure, breaking with British railway tradition, and mirroring a contemporary management practice more common in the United States, appointing a president and vice-presidents. On 4 January 1926, Josiah Stamp was appointed first president of the executive, the equivalent of a chief executive in modern organisational structures. He added the role of chairman of the board of directors to his portfolio in January 1927, succeeding Sir Guy Granet.
The Stanier revolution
The arrival of the new chief mechanical engineer, William Stanier, who was brought in from the Great Western Railway by Josiah Stamp in 1932, heralded a change. Stanier introduced practices used at the Swindon Works that had been introduced by George Jackson Churchward, such as tapered boilers, long travel valves, and large bearings. His locomotives were not only more powerful, and economical, but they also ended the company's internal conflict.
Nationalisation
The war-damaged LMS was nationalised in 1948 by the Transport Act 1947, becoming part of British Railways. It formed the London Midland Region and part of the Scottish Region. British Railways transferred the lines in Northern Ireland to the Ulster Transport Authority in 1949. The London Midland & Scottish Railway Company continued to exist as a legal entity for nearly two years after Nationalisation, being formally wound up on 23 December 1949. The lines in Great Britain were rationalised through closure in the 1950s to 70s but the main routes survive and some have been developed for 125 mph inter-city services.
From Wikipedia’s article on London, Midland and Scottish Railway, shared under CC BY-SA 4.0.4
