How it started
History
Lonza was founded in 1897 in the small Swiss town of Gampel, situated in the canton of Valais, taking its name from the nearby river. In the course of the 20th century Lonza evolved from hydroelectricity and C2 chemistry, through nitrogen chemistry to petrochemistry before moving into fine chemistry and biochemistry.
Initially, the company produced electricity. Lonza moved to neighbouring Visp (where it retains a production site today) in 1909. Competition from electric lighting reduced demand for calcium carbide and in 1915 Lonza started industrial production of calcium cyanamide which became popular as a cheap nitrogenous fertiliser, only to be supplanted by urea. In 1923, Lonza started to convert calcium carbide to metaldehyde (sold as a solid fuel under the brand 'Meta' and then slug repellant) via acetylene and acetaldehyde. In 1925, ammonia production was started, with a process licensed from Casale. With calcium cyanamide and calcium nitrate (made from nitric acid), Lonza commercialised formulated fertilisers starting in the 1930s. At the start of World War II, Lonza was contracted by the Swiss government to produce synthetic fuel, which it did by converting acetaldehyde to paraldehyde, used as an additive in transport fuel.
Lonza is involved in the manufacturing of biologics with several pharmaceutical companies. Lonza entered into a partnership with Teva in 2009 to develop and manufacture biosimilars. In 2010, they made a deal with GlaxoSmithKline to manufacture therapeutic monoclonal antibodies. In 2014, Lonza entered into an agreement with Bristol-Myers Squibb to manufacture two biologic drugs. Lonza also manufactures Imbruvica for Pharmacyclics and Mydicar for Celladon. In 2015, Lonza contracted with Alexion to construct a new facility dedicated to Alexion manufacturing. In 2017, Lonza and Sanofi partnered to construct a new facility for production of biologics. Lonza entered into cell and gene therapy with the acquisition of Houston-based Vivante GMP Solutions in 2010.
In November 2019, Chairman Albert Baehny became both chairman and interim CEO of Lonza after chief executive officer (CEO) Marc Funk left after 9 months. In November 2020, Pierre-Alain Ruffieux commenced his role as Chief Executive Officer which ended at the end of September 2023, totaling 2 years and 11 months in the position of CEO. Chairman Albert Baehny became again, both chairman and interim CEO, as from October 2023.
In May 2020, Moderna struck a manufacturing deal with Lonza to produce its (mRNA-1273) COVID-19 vaccine active ingredient while expanding sterile production and fill-finish activities to 500 million doses starting in 2021. Production of the mRNA bulk vaccine started in January 2021, soon after an official visit by Swiss Federal Councilor Alain Berset. Lonza Group was responsible for the global production of two-thirds of the raw materials for the Moderna vaccine at combined U.S. and Swiss facilities.
From Wikipedia’s article on Lonza Group, shared under CC BY-SA 4.0.2
