Private company

Manchester, Sheffield and Lincolnshire Railway

Logo: Bobyllib at English Wikipedia, Public domain, via Wikimedia Commons3

Former British railway company

The Manchester, Sheffield and Lincolnshire Railway (MS&LR) was formed in 1847 when the Sheffield, Ashton-under-Lyne and Manchester Railway joined with authorised but unbuilt railway companies, forming a proposed network from Manchester to Grimsby. It pursued a policy of expanding its area of influence, especially in reaching west to Liverpool, which it ultimately did through the medium of the Cheshire Lines Committee network in joint partnership with the Great Northern Railway (GNR) and the Midland Railway.2 It ceased to exist in 1897.1 Wikipedia text CC BY-SA 4.0

Last updated Oct 20, 2026.

Overview

1847Founded1
  • HeadquartersManchester1

The Manchester, Sheffield and Lincolnshire Railway (MS&LR) was formed in 1847 when the Sheffield, Ashton-under-Lyne and Manchester Railway joined with authorised but unbuilt railway companies, forming a proposed network from Manchester to Grimsby. It pursued a policy of expanding its area of influence, especially in reaching west to Liverpool, which it ultimately did through the medium of the Cheshire Lines Committee network in joint partnership with the Great Northern Railway (GNR) and the Midland Railway.2

Corporate structure

Manchester, Sheffield and Lincolnshire Railway sits at the top of its group. 3 entities, 1 country on record. Switch between the flow chart and the network, and select any entity to see its details.

Built from subsidiaries, stakes and holdings from Wikidata (CC0); major holders from Schedules 13D and 13G. Each entity in the chart links to its source.

What it owns

What Manchester, Sheffield and Lincolnshire Railway reports owning in its annual reports to the SEC: buildings, land and equipment, real estate and locations, investments, intangible assets and inventory, at the end of its latest fiscal year and a year before.

Stakes and holdings (Wikidata)

Things Wikidata records the company as owning, with the share when stated.1

The story

Origin

The Sheffield, Ashton under Lyne and Manchester Railway (SA&MR) had opened throughout on 23 December 1845. Its line ran through the Woodhead Tunnel, a little over 3 miles in length. The line connected with the Manchester and Birmingham Railway at its western end, and had a basic terminus in Sheffield at Bridgehouses. There was a branch from Dinting to Glossop, and another from Guide Bridge to Stalybridge. The SA&MR had been short of money during construction, and the Woodhead Tunnel was built as a single track to save money.

As the Railway Mania took hold, it became evident that enlargement of the network dominated by a railway company was key to competitive survival, and in 1846 the SA&MR had been authorised, by the Manchester, Sheffield and Lincolnshire Railway Act 1846 (9 & 10 Vict. c. cclxviii) of 27 July 1846, to amalgamate with three as-yet unbuilt railways: they were:

The Great Grimsby and Sheffield Junction Railway had been authorised by the Great Grimsby and Sheffield Junction Railway Act 1845 (8 & 9 Vict. c. l) of 30 June 1845 to build from Gainsborough to Grimsby. At Gainsborough it was to connect with the proposed Sheffield and Lincolnshire Junction Railway, and this justified the word "Sheffield" in its title. A further act of Parliament, the Great Grimsby and Sheffield Junction Railway (Lincoln Extension) Act 1846 (9 & 10 Vict. c. xcix) of 26 June 1846 authorised a branch from Wrawby South Junction at Barnetby down to Lincoln, and an extension from there to Newark, on the Great Northern Railway; and in addition a branch to Barton-on-Humber from Brocklesby and a branch to Cleethorpes from Grimsby.

The Sheffield and Lincolnshire Junction Railway was authorised by the Sheffield and Lincolnshire Junction Railway Act 1846 (9 & 10 Vict. c. ccciv) of 3 August 1846 to build from Sheffield to Gainsborough.

The Sheffield and Lincolnshire Extension Railway was also authorised by the Sheffield and Lincolnshire Extension Railway Act 1846 (9 & 10 Vict. c. cccxix) on 3 August 1846, connect with the S&LJR at Clarborough Junction, east of Retford, and to run south-east to Sykes Junction, north of Lincoln, where it joined the Great Northern Railway and ran by running powers into Lincoln.

The amalgamation took effect on 1 January 1847, and the combined company was named the Manchester, Sheffield and Lincolnshire Railway. It had headquarters at Manchester London Road station. The first board meeting of the amalgamated company took place on 6 January 1847.

First years 1847–1849

In 1847 the railway network of the MS&LR consisted of nothing more than the network of the SA&MR, with one small addition. On the first day of 1847 a short spur connection was opened from the Sheffield terminal to the Sheffield station of the Midland Railway (former Sheffield and Rotherham Railway). At this time the Midland approached from the Rotherham direction only, and it had a terminal station adjacent to Wicker, and named after that thoroughfare. The short connecting link was steeply graded and almost entirely in tunnel; it was only used for wagon exchange purposes.

Having now taken over three large railway schemes that were authorised but not yet started, the MS&LR had to let large contracts for construction. In February 1847 nearly half a million pounds worth of work was commissioned; the Sheffield and Lincolnshire Junction Railway main line from Woodhouse (near Sheffield) to Gainsborough, the Grimsby line to Market Rasen, and a second bore of the Woodhead Tunnel. The eastward construction from the Bridgehouses terminus across Sheffield was started in May 1847.

Read the full text

The MS&LR soon ran short of money, and a loan of £250,000 had to be negotiated; deliveries of locomotives were slowed, as were certain infrastructure improvements; the stations at Dog Lane, Hazlehead, Oxspring and Thurgoland were closed to passenger traffic as from 1 November 1847. One new station was provided, at Dinting, at the Glossop branch junction. The original Dinting station was closed after an interval. In its first year of operation, the MS&LR had paid a 5% dividend on ordinary stock. This fell to 2+1⁄2% for the first half of 1848, since when there were no further payments for six years.

Progress continued on building the line between Grimsby and New Holland. The Grimsby-Louth line of the East Lincolnshire Railway (now leased to the Great Northern Railway) was nearing completion too, and both lines opened on 1 March 1848. There was a through train service between New Holland and Louth, operated equally by both companies. A pier 1,500 feet (460 m) in length had been provided at New Holland, which was the terminal of a ferry service to Hull. It was promised that "the rails of the New Holland line will be continued to the extremity of the pier".

Next opening was from a junction at Ulceby (about halfway between New Holland and Grimsby) to Brigg, and a second arm of that line to Market Rasen. These sections opened on 1 November 1848.

Notwithstanding the difficult financial conditions, the MS&LR network as originally planned was completed during 1849, except for the new station at Sheffield (still under construction), the Leverton branch (as the Sheffield and Lincolnshire Extension Railway was now called) and certain dock works at Grimsby. There was an impressive succession of openings: the Barnetby-Lincoln line was opened on 1 February 1849, and the section from Sheffield to Beighton, where a junction was made with the Midland Railway, was opened on 12 February 1849. MS&LR passenger trains ran through to Eckington on the Midland Railway from Beighton. A triangular junction was formed at New Holland, leading to a branch to Barton on Humber, opened on 1 March 1849. On 2 April 1849 the section between Brigg and Gainsborough was opened. There was a triangular junction at Ulceby: the eastern side of the triangle had been in use since before July 1848.

The final link, from Woodhouse junction, on the Sheffield-Beighton junction section, to Gainsborough, was formally opened on 16 July 1849. A special train conveying the Directors ran from Liverpool to Grimsby in five hours. The line was opened to the public the following day, 17 July 1849.

There were two stations at Stalybridge: the former SA&MR station and one belonging to the Lancashire and Yorkshire Railway (L&YR). The companies agreed to rationalise, with the MS&LR station handling all passenger business, and the L&YR all the goods business. The necessary junctions between the two routes at Stalybridge were ready on 1 July 1849, and on 1 August two new junctions with the London and North Western Railway (LNWR) were brought into use as well, end-on at Stalybridge with the new line from Huddersfield, and at Guide Bridge station, with the line from Heaton Norris.

At the end of 1849, the MS&LR network amounted to 159 miles, with an additional 110 miles of canal.

Establishment of the Cheshire Lines Committee

The Great Northern Railway (Cheshire Lines) Act 1863 (26 & 27 Vict. c. cxlvii) allowed the GNR and the MS&LR to regulate traffic on lines built, or proposed to be built in the Cheshire area. The Midland Railway was something of a latecomer to the area and became a natural ally of the MS&LR and the GNR locally, and was admitted to the controlling group.

The Cheshire Lines Transfer Act 1865 (28 & 29 Vict. c. cccxxvii) of 5 July 1865 therefore allowed the Midland Railway to join in the committee which it did in 1866. The Cheshire Lines Act 1867 (30 & 31 Vict. c. ccvii) of 15 August 1867 named the resultant group as the Cheshire Lines Committee (CLC) and gave it complete autonomy.

The constituent companies absorbed by the committee were;

The Stockport and Woodley Junction Railway;

The Stockport, Timperley and Altrincham Junction Railway;

The West Cheshire Railway;

The Cheshire Midland Railway;

The Garston and Liverpool Railway.

The powers of the Liverpool Central Station Railway were acquired on 30 July 1866.

Smith and Anderson describe the rolling stock:

Initially the CLC hired carriages and wagons from the owning partners, but soon purchased its own rolling stock. By the grouping of 1923 it had nearly 600 coaches and over 4,000 goods vehicles on its books. Many of the former were used on Liverpool-Manchester expresses and they exuded luxury. Handsome composites built by the Lancaster Carriage & Wagon Company had first class compartments lined in mahogany and upholstered with green or brown velvet, whilst the exceptionally fine coaches supplied by Great Central workshops (in 1914) featured first class accommodation finished in walnut and sycamore with fittings of oxidised copper and deep blue cloth seats. Such opulence was understandable in view of the popularity of the CLC service, but this was only possible because of the extension to Liverpool Central.

From Wikipedia’s article on Manchester, Sheffield and Lincolnshire Railway, shared under CC BY-SA 4.0.4

Products and brands

  • rail transport

Listed on Wikidata.1

Subsidiaries and ownership

Also owns

From Wikidata.1

Acquisitions

  1. Feb 1, 1866Acquired West Riding and Grimsby Railway1
  2. Jul 5, 1865Acquired Marple, New Mills and Hayfield Junction Railway1
  3. Succeeded Great Grimsby and Sheffield Junction Railway1
  4. Succeeded Sheffield and Lincolnshire Junction Railway1
  5. Succeeded Sheffield, Ashton-under-Lyne and Manchester Railway1
  6. Succeeded by Great Central Railway1

Timeline

  1. Jul 31, 1897Dissolved Dissolved1
  2. 1847Founded Founded1