The story
James Bay Railway
The line was originally chartered as the Lake Nipissing And James Bay Railway in 1884. The original route ran roughly northward from Callander to Moose River on James Bay. However, in 1902, before construction started, the Canadian Northern Railway (CNoR) took over the charter and used it as the basis for a new line running northwest from Parry Sound to Sudbury, with an additional line running from Parry Sound south to Toronto. The section running south to Toronto opened on November 6, 1906. The northern section was completed in 1908, although by this time it had been rechartered as part of the Canadian Northern Ontario Railway (CNOR).
Temiskaming and Northern Ontario Railway (1902–46)
With the original plans having been dropped, and a railway on this route still desired, the new Temiskaming and Northern Ontario Railway was incorporated on 17 March 1902, by the Temiskaming and Northern Ontario Railway Act of the Ontario parliament. The railway was to be a provincial Crown corporation overseen by the Temiskaming and Northern Ontario Railway Commission. Construction on the railway started in 1903, and the settlement of Redwater in the municipality of Temagami began as a small request stop when the railway reached the area of the Lower and Upper Redwater Lakes.
As it passed by Long Lake, near the 103 mile marker, the largest silver rush in Canada was sparked by workers looking for trees for railway ties. The town of Cobalt grew out of the fortunes of silver taken from the grounds. By 1905, it reached New Liskeard in the Lake Timiskaming area. The railway reached Englehart in 1906 and Cochrane in 1909. In the next few years, several branch lines were built.
In 1921, construction on a line north to James Bay was started. In 1923, the new Conservative premier of Ontario, Howard Ferguson, halted further construction, saying that it would be unprofitable. For four years the terminus of the line remained at Fraserdale, near Abitibi Canyon, where the Abitibi Canyon Generating Station was being built on the Abitibi River. Between 1928 and 1930 the railway was extended north at a slow pace. The pace of construction was quickened in 1930 as a make-work project due to the depression. The extension to James Bay was opened on July 15, 1932. The terminus of the railway was at the mouth of the Moose River near the old trading post of Revillon Frères. It was named Moosonee, from the Cree meaning "at the moose".
A name change for the railway was first proposed in 1942 by Arthur Cavanagh, who was chairman of the commission between 1940 and 1944. He noted that it would have the advantage of associating the railway with the province, not just the District of Timiskaming. A name change would also avoid confusion with the Texas and New Orleans Railway, which had the same initials. The Ontario railway often had boxcars misdirected in the United States, while receiving invoices that should have gone to Texas. The railway's name was changed to the Ontario Northland Railway on April 5, 1946, when a bill amending the Temiskaming and Northern Ontario Railway Act received assent.
1946–2010
Three new mines were opened in Northern Ontario in the 1960s. Sherman Mine in Temagami was opened in 1968, Adams Mine in Kirkland Lake in 1963, and Kidd Creek Mine in Timmins in 1967. The Ontario Northland Railway built spurs to serve these mines.
In 1993, CN applied to abandon sections of its underused former National Transcontinental Railway mainline across northern Ontario (it had previously abandoned the portion of the line between Calstock and Nakina in 1988). The portion between Calstock and Cochrane was sold to ONR.
In December 2000, the Ontario government announced that it would be privatizing the railway. CN submitted a bid in March 2002, and in October the government gave it exclusive rights to negotiate a purchase of the railway. However, the deal fell through on July 2, 2003, over the government's insistence on job guarantees, and the railway remained in public hands. On February 25, 2005, CN and ONR signed a routing agreement in which ONR would transport CN's freight traffic between Noranda and either Hearst or North Bay.
Read the full text
On April 14, 2010, there was news of a proposed Ontario Northland takeover of the controversial Ottawa Valley rail tracks. However, this development never came to fruition.
Proposed divestment, end of the Northlander, restructuring (2012–2014)
On March 23, 2012, the Ontario government announced that it would begin to wind down the ONTC, citing increased costs to the government and stagnant ridership. ONR passenger train service between Toronto and Cochrane (the Northlander) was withdrawn and replaced with an augmented bus service, and all of the corporation's assets were to be sold off. On August 16, the Ontario Government announced that Northlander train service would end on September 28, 2012, and Ontera will be sold off.
Northern Ontario municipal leaders had continued to express their fears regarding the divestment. They indicated that the ONR provides a fundamental link to many remote and rural communities and provides freight transport to many companies, including mining and forestry, allowing them to thrive. They indicate that the government maintained its funding to the GO Transit network in Southern Ontario and it is important to not forget about the important service the ONR provides to Northern Ontario residents. In February 2014, the new premier of Ontario, Kathleen Wynne, met with northern community leaders and the head of the company and union to discuss the future of the company. They decided the union and management would present a reconstruction plan to the government for consideration.
In late February 2014 a report to restructure the ONTC was delivered to the Minister of Northern Development and Mines. The proposal detailed how the organization could be modernized both culturally and in job reductions through attrition. The report was well received by the minister who appreciated how management and labour come together to explore options for the corporation.
In April 2014 the provincial government concluded the company would remain in public hands. However, Ontera (its telecommunication division) would be sold off to Bell Aliant. The government would reinvest in the company to purchase new coaches and refurbish rolling stock for the Polar Bear Express. This decision was supported by other members of Provincial Parliament after the auditor general's review cited that it would have cost the taxpayer $820 million instead of saving $265.9 million over three years had the divestment proceeded.
Plans to resume Northlander passenger service
In December 2020, the province released the draft transportation plan for northern Ontario which recommended continuing to move forward on a plan for passenger rail services. In May 2021, the provincial government announced plans for Ontario Northland and Metrolinx to write a business plan to resume passenger operations between Toronto and northeastern Ontario with a 13-stop route to begin service by the mid-2020s. In November 2021, the decision was made to make the new terminus Timmins (previously Cochrane) due to its size and the fact that it serves as a regional transportation hub. Test runs were conducted in March and November 2021, where several northern Ontario mayors, MPPs, and local residents were taken from North Bay to Toronto's Union Station.
In December 2022, the provincial government announced that it would purchase three new train sets from Siemens Mobility at a cost of $140 million. Each train set would consist of a Charger locomotive and three Venture passenger cars. The train sets are for the restoration of Northlander train service between Toronto and Cochrane, which would operate four to seven times per week depending on season. There would be 16 stops: Toronto (Union Station), Langstaff, Gormley, Washago, Gravenhurst, Bracebridge, Huntsville, South River, North Bay, Temagami, Temiskaming Shores, Englehart, Kirkland Lake/Swastika, Matheson, Timmins and Cochrane.
In February 2026, the provincial government purchased the northern portion of the Newmarket Subdivision from CN for $138 million, extending the Ontario Northland track network southward by 205 kilometres (127 mi) to Washago.