The story
En route to a state railway
After the completion of the privately financed Leipzig–Dresden railway in 1839, the Saxon parliament also began to get involved in railway construction. Early on it was recognised that railway lines to Bavaria, Bohemia and Silesia were needed and that there ought to be a route running north-to-south through the kingdom. The funding of this plan lay in the hands of privately financed railway committees. The state, however, saw itself arranging for the corresponding political and legal hurdles to be cleared. On 14 January 1841 a treaty was agreed with the Kingdom of Bavaria and the Duchy of Saxony-Altenburg for the construction of a railway route between Leipzig and Hof. On 22 June 1841, the Saxon-Bavarian Railway Company was founded and on 19 September 1842 railway services between Leipzig and Altenburg station were opened. Because the construction costs exceeded the planned limits, the state had to jump in and honour its previously made promise to complete the construction at the national expense. On 1 April 1847 the railway line, which was finished as far as Reichenbach im Vogtland was transferred to state ownership.
At the same time the Royal Saxon-Bavarian State Railway Division (Königlichen Direction der Sächsisch-Bayerischen Staatseisenbahn) in Leipzig began work. Specific regulations were laid down by the state parliament. The board of directors was accordingly given the appropriate powers and was assigned directly to a state ministry. The payroll of the officials was to be approved by the state parliament and railway fares by the provincial legislature. In addition to funding for the construction of the line, in particular the Göltzsch Viaduct and Elster Viaduct, agreements had to be reached with Saxony-Altenburg and Bavaria over owning and operating relationships. On 15 July 1851, the line to Hof (Saale) was completed.
Because no suitable private company had been found to build the Saxony-Bohemian Railway from Dresden to Bodenbach, the state took over this task itself. On the opening of the section from Dresden to Pirna on 1 August 1848, Saxony had its second state railway line, for which the 'Royal Division for the Construction and Operation of the Saxony-Bohemia Railway' (Königliche Direction für Bau und Betrieb der Sächsisch-Böhmischen Staatseisenbahn) was established, with a head office in Dresden.
On 24 July 1843 a treaty was concluded with the Kingdom of Prussia for the construction of a railway route from Dresden via Bautzen to the Prussia towns of Görlitz and Bunzlau. That made it possible to put in the important link to Breslau.
On 1 September 1847, the 102 km long route from Dresden to Görlitz was opened by the Saxon-Silesian Railway (Sächsisch-Schlesische Eisenbahn), a private company that had formed with state support. On 31 January 1851 this company was transferred to state ownership. At the same time the running powers of the private Löbau-Zittau Railway Company (Löbau-Zittauer Eisenbahn-Gesellschaft) were taken over. By combining the management of the two lines radiating from Dresden savings were supposed to be made. Thus, the 'Royal Division of Saxon-Bohemian and Saxon-Silesian State Railways in Dresden (Königliche Direction der Sächsisch-Böhmischen und Sächsisch-Schlesischen Staatseisenbahnen in Dresden) was formed, which on 14 December 1852 was thankfully renamed to the rather more succinct 'Royal Dresden State Railway Division' (Königliche Staatseisenbahn-Direction zu Dresden).
On 1 October 1853 the 'Royal Chemnitz-Riesa State Railway Division' (Königliche Direktion der Chemnitzer-Riesaer Staatseisenbahn) was established. It had the task of completing the construction of the Riesa–Chemnitz railway and running the line subsequently. This had been necessary, after the private firm, the Chemnitz-Riesa Railway Company, had gone bankrupt due to the cost of structures needed between Waldheim und Döbeln.
Unlike Prussia, Saxony never issued a railway law. This meant that every railway proposal had to be agreed in the state parliament. In spite of the negative experiences of the past, the next ten years saw an increase in the construction of state railways. The work was not without problems, due to geographical difficulties. The extension of the route between Chemnitz and Riesa as well as the line from Freiberg to Tharandt were technically challenging and correspondingly expensive.
On 15 November 1858 the line from Chemnitz to Zwickau was completed. That meant there was now a link from Riesa to the Saxon-Bavarian Railway over the line from Zwickau that had been built in 1845. As a result, the Chemnitz Division was disbanded and the management of its routes transferred to the Leipzig Division, which was given the title of "Royal Division of the State's Western Railways" (Königliche Direktion der westlichen Staatseisenbahn). At the same time the Dresden Division was renamed the "Royal Division of the State's Eastern Railways" (Königliche Direktion der östlichen Staatseisenbahnen).
Read the full text
In 1862 the state railways had an overall length of 525 km. In addition to the Leipzig-Dresden Railway, there were now private coal railways in the Saxon coal regions of Zwickau and Döhlen, as well as the Zittau-Reichenberg Railway. The state however had an 11/12 stake in the latter.
By 1865 links from Leipzig to Corbetha and Bitterfeld, and hence connexions to Magdeburg and Berlin, were established as well as the Voigtländ State Railway (Herlasgrün–Eger).
One crucial event in the history of Saxon railway operations turned out to be the Austro-Prussian War of 1866 between Prussia and Austria. Because Saxony was on the Austrian side, it evacuated all the locomotives to Hof, Eger and Budapest when Prussian troops invaded. During the course of the war the Ostrau Viaduct and the bridge over the Elbe at Riesa were destroyed. In the subsequent peace treaty, Prussia was given ownership of those sections of the Silesian Railway that ran through its territory as well as Görlitz station. A Prussian route from Leipzig to Zeitz also had to be permitted.
In the following years the railway network was further expanded. Lines in the upper Ore Mountains appeared after Schwarzenberg/Erzgeb. was given a railway connexion in 1858. In 1866, the railway to Annaberg-Buchholz joined the network and the line to Weipert followed in 1872. The most important reason was the transportation of brown coal from the north Bohemian basin. In 1869 the gap between Flöha and Freiberg was finally closed and the two networks joined together.
As a result, on 1 July 1869, the Leipzig and Dresden divisions were merged into the new "Royal General Division of the Saxon State Railways" (Königlichen Generaldirection der sächsischen Staatseisenbahnen), abbreviated to K. Sächs. Sts. E. B. “, in Dresden.
One of the managing directors of the Saxon state railways was the privy councillor, Otto von Tschirschky and Bögendorff, the father-in-law of the later General Paul von der Planitz.
Further expansion
The years after the foundation of the Reich in 1871 were also marked, in Saxony, by a large number of private railway construction projects. However, in most cases the state had to come to their aid in order to complete the planned routes and to continue to run them. In addition, further building work was carried out in order to expand the network. The construction of railways made it possible to site industry even in the villages of the Ore Mountains and the Lausitz and to foster under-developed regions. On 1 July 1876 the state took over the Leipzig-Dresden railway and thereby increased the network length by 337.5 km. Subsequently, almost all remaining private railway companies in Saxony were taken over in order to be ready for a planned Reich railway project under Prussian leadership.
Because the construction and operations of lines was not always covered by the profits, ways to simplify things began to be investigated. As early as 1865 the engineer's forum of the Union of German Railway Administrations (Verein Deutscher Eisenbahnverwaltungen) set out principles for secondary lines. These were legally implemented in 1878 as part of the 'Railway Regulations for German Railways of Lower Importance' (Bahnordnung für deutsche Eisenbahnen untergeordneter Bedeutung). The routes built to these simpler regulations were known in Saxony as 'secondary lines' or Sekundärbahnen (Singular: Sekundärbahn). Twenty-six routes totalling 453 km were immediately run as Sekundärbahnen and in 1879 the first newly built Sekundärbahn, the suburban route from Leipzig to Gaschwitz via Plagwitz.
Because even Sekundärbahnen did not produce the desired savings in every case, in 1881 the construction of the first 750 mm (2 ft 5+1⁄2 in) narrow gauge railways began. On 17 October 1881 the section of line between Wilkau and Kirchberg (Sachsen) was opened. By 1920 Saxon narrow gauge railways had a total length of 519.88 km.
The most important railway structures were the Dresden Hauptbahnhof built from 1891 to 1901 and the Leipzig Hauptbahnhof which was finished in 1915. Both were linked to the cities with extensive modifications to the railway yards.
On the abdication of King Friedrich August III in 1918 and the transformation of the kingdom to a free state, the appellation 'Royal' (Königlich) was dropped and the railway administration in Saxony called itself the 'Saxon State Railways' (Sächsische Staatseisenbahnen or Sächs. Sts. E.B.). The Saxon State Railways brought 3370 km of track into the Deutsche Reichsbahn network in 1920.
From Wikipedia’s article on Royal Saxon State Railways, shared under CC BY-SA 4.0.3
