The story
Origins
Coal from the inland mines in southern County Durham used to be taken away on packhorses and later on horse-drawn carts as the roads were improved. A canal was proposed by George Dixon in 1767 and again by John Rennie in 1815, but both schemes failed. The harbour of Stockton-on-Tees invested considerably during the early 19th century in straightening the Tees in order to improve navigation on the river downstream of the town and was subsequently looking for ways to increase trade to recoup those costs.
A few years later, a canal was proposed on a route that bypassed Darlington and Yarm, and a meeting was held in Yarm to oppose the route. The Welsh engineer George Overton was consulted, and he advised building a tramroad. Overton carried out a survey and planned a route from the Etherley and Witton Collieries to Shildon, and then passing to the north of Darlington to reach Stockton. The Scottish engineer Robert Stevenson was said to favour the railway, and the Quaker Edward Pease supported it at a public meeting in Darlington on 13 November 1818, promising a five per cent return on investment. Approximately two-thirds of the shares were sold locally, and the rest were bought by Quakers nationally. A private bill was presented to Parliament in March 1819, but as the route passed through Earl of Eldon's estate and one of the Earl of Darlington's fox coverts, it was opposed and defeated by 13 votes.
Overton surveyed a new line that avoided Darlington's estate and agreement was reached with Eldon, but another application was deferred early in 1820, as the death of King George III had made it unlikely a bill would pass that parliamentary year. The promoters lodged a bill on 30 September 1820, the route having changed again as agreement had not been reached with Viscount Barrington about the line passing over his land. The railway was unopposed this time, but the bill nearly failed to enter the committee stage as the required four-fifths of shares had not been sold. Pease subscribed £7,000; from that time he had considerable influence over the railway and it became known as "the Quaker line". The Stockton and Darlington Railway Act 1821 (1 & 2 Geo. 4. c. xliv), which received royal assent on 19 April 1821, allowed for a railway that could be used by anyone with suitably built vehicles on payment of a toll, that was closed at night, and with which land owners within 5 miles (8 km) could build branches and make junctions; no mention was made of steam locomotives. This new railway spurred the construction of more railway lines, causing significant developments in railway mapping and cartography, iron and steel manufacturing, as well as in any industries requiring more efficient transportation.
Founding of Middlesbrough
The export of coal had become the railway's main business, but the staiths at Stockton had inadequate storage and the size of ships was limited by the depth of the Tees. A branch from Stockton to Haverton, on the north bank of the Tees, was proposed in 1826, and the engineer Thomas Storey proposed a shorter and cheaper line to Middlesbrough, south of the Tees in July 1827. Later approved by George Stephenson, this plan was ratified by the shareholders on 26 October. The Tees Navigation Company was about to improve the river and proposed that the railway delay application to Parliament, but, despite opposition, at a meeting in January 1828 it was decided to proceed. A more direct northerly route from Auckland to the Tees had been considered since 1819, and the Tees and Weardale Railway had applied unsuccessfully to Parliament for permission for such a line in 1823, 1824 and 1825. This now became a 11+1⁄2-mile (18.5 km) line linking Simpasture on the S&DR's line near today's Newton Aycliffe station with Haverton and Stockton, via a route that was 6 miles (10 km) shorter than via the route of the S&DR, and named the Clarence Railway in honour of the Duke of Clarence, later King William IV.
Meetings held in Stockton in early 1828 supported the Tees Navigation and the Clarence Railway, but the S&DR received permission for its branch on 23 May 1828 after promising to complete the Hagger Leases Branch and to build a bridge across the Tees at least 72 feet (22 m) wide and 19 feet (5.8 m) above low water, so as not to affect shipping. Two members of the management committee resigned, as they felt that Stockton would be adversely affected by the line, and Meynell, the S&DR chairman, stepped down from leadership. The Clarence Railway was approved a few days later, with the same gauge as the S&DR. The route of the Clarence Railway was afterwards amended to reach Samphire Batts, later known as Port Clarence, and traffic started in August 1833; by the middle of 1834 Port Clarence had opened and 28 miles (45 km) of line was in use. The S&DR charged the 2+1⁄4d per ton per mile landsale rate for coal it carried the 10 miles (16 km) from the collieries to Simpasture for forwarding to Port Clarence, rather than the lower shipping rate. By July 1834, the Exchequer Loan Commissioners had taken control of the Clarence Railway.
The Croft branch opened in October 1829. Construction of the suspension bridge across the Tees started in July 1829, but was suspended in October after the Tees Navigation Company pointed out the S&DR had no permission to cross the Old Channel of the Tees. The S&DR prepared to return to Parliament but withdrew after a design for a drawbridge was agreed with the navigation company. The line to Middlesbrough was laid with malleable iron rails weighing 33 lb/yd (16 kg/m), resting on oak blocks. The suspension bridge had been designed to carry 150 tons, but the cast iron retaining plates split when it was tested with just 66 tons and loaded trains had to cross with the waggons split into groups of four linked by a 9-yard-long (8.2 m) chain. For the opening ceremony on 27 December 1830, Globe, a new locomotive designed by Hackworth for passenger trains, hauled people in carriages and waggons fitted with seats across the bridge to the staiths at Port Darlington, which had berths for six ships. Stockton continued to be served by a station on the line to the quay until 1848, when it was replaced by a station on the Middlesbrough line on the other side of the Tees. Before May 1829, Thomas Richardson had bought about 500 acres (200 ha) near Port Darlington, and with Joseph and Edward Pease and others he formed the owners of the Middlesbrough Estate to develop it. Middlesbrough had only a few houses before the coming of the railway, but a year later had a population of over 2,000 and at the 2011 census had over 138,000 people.
Later history
The NER had built a branch in the late 1850s from Durham to Bishop Auckland, but used a separate station in the town until December 1867, when all services began to use the S&DR station. The Sunniside Incline was replaced by a deviation, albeit with gradients of 1 in 51 and 1 in 52, which opened for mineral traffic on 10 April 1867 and for passengers on 2 March 1868; after 1868 trains on this line were extended to serve Benfieldside station (later known as Blackhill and then Consett). In Cleveland, a branch from Nunthorpe to Battersby opened on 1 June 1864; passengers were carried from 1 April 1868. A branch from Barnard Castle to Middleton-in-Teesdale opened on 12 May 1868.
The locomotive works at Darlington operated independently under Bouch until 1875, the locomotives having been renumbered by the NER a few years earlier. A variety of locomotives were used, the most common type were the 0-6-0s used on mineral trains. Later locomotives were of the Stephenson long boilered type. Most passenger locomotives were 2-4-0s, though some were 2-2-2s. Bouch designed two 4-4-0 locomotives for the line over Stainmore in 1860, and another fourteen with this wheel arrangement had been built by 1874. S&DR services and those on the ECML called at different stations in Darlington until 1887, when S&DR trains were diverted through a rebuilt Darlington Bank Top station, rejoining the route to Stockton from a junction south of Darlington and a new line to Oak Tree Junction. An extension from Stanhope to Wearhead opened in 1895, and the line over Stainmore to Tebay was doubled by the end of the century.
Read the full text
From 1913 former S&DR lines were electrified with 1,500 VDC overhead lines and electric locomotives hauled coal trains between Shildon and Erimus Marshalling Yard, which had opened in 1908 between Middlesbrough and Thornaby. The trains took the former S&DR line from Shildon to Simpasture Junction, joining the former Clarence Railway line to Carlton, where a later line allowed access to the Stockton to Middlesbrough extension. The locomotives operated for 20 years, but then coal traffic had reduced, which made it uneconomical to maintain the electrification system.
As a result of the Railways Act 1921, on 1 January 1923 the North Eastern Railway became the North Eastern area of the London and North Eastern Railway (LNER). The passenger service was withdrawn north of Tow Law on 1 May 1939. Britain's railways were nationalised on 1 January 1948 and the lines were placed under the control of British Railways. In the early 1950s control was split between the North Eastern and London Midland regions with Kirkby Stephen as the boundary. Local passenger trains were withdrawn between Kirkby Stephen and Tebay on 1 December 1952. The service along Weardale was withdrawn on 29 June 1953 and services north of Crook on 11 June 1956.
The 1955 Modernisation Plan, known formally as the "Modernisation and Re-Equipment of the British Railways", was published in December 1954. With the aim of increasing speed and reliability steam trains were replaced with electric and diesel traction. From 1954 diesel multiple units took over passenger services in the north east except those on the ECML, and were introduced to the line over Stainmore in February 1958. The passenger service was withdrawn between Barnard Castle and Penrith on 20 January 1962, and between Bishop Auckland and Barnard Castle on 12 June 1962.
In 1963, Richard Beeching published his report The Reshaping of British Railways, which recommended closing the network's least used stations and lines. This included the remaining former S&DR lines except for the line between Darlington and Saltburn via Stockton and Middlesbrough. Passenger service between Nunthorpe and Guisborough was withdrawn in 1964; the service between Middlesbrough and Nunthorpe was retained. The line between Darlington and Barnard Castle and the branch to Middleton-in-Teesdale were closed to passengers on 30 November 1964. Trains were withdrawn north of Bishop Auckland on 8 March 1965, but the passenger service to Bishop Auckland was saved because of regional development concerns.
From Wikipedia’s article on Stockton and Darlington Railway, shared under CC BY-SA 4.0.3