The story
In 1899, Colonel Peter O. Knight created Tampa Electric Company to serve the energy needs of a growing Tampa community.
In 1903, a steam generating plant, renamed the Peter O. Knight Station in 1969, was built on Jackson Street, and by 1906, the first turbo-generator was installed. At the dawn of the 20th Century, Tampa Electric Company promoted such conveniences as electric lights and fans, and over more than 20 miles of track connecting Tampa, Ybor City and Ballast Point.
Modern downtown offices were opened in 1914 at the corner of Cass and Tampa Street. At the end of the century, Tampa Electric and parent company, TECO Energy, employed more than 5,000 men and women in six states and South America.
On September 4, 2015, Emera, a utility holding company based in Halifax, Nova Scotia, Canada, announced the pending acquisition of TECO Energy. That purchase closed on July 1, 2016, and TECO Energy, Inc. became a wholly owned subsidiary of Emera, Inc.
From Wikipedia’s article on TECO Energy, shared under CC BY-SA 4.0.5
