The story
1993
Foundation of Volkswind as IPP
Installation of the first windmill with capacity of 500 kW
1997
Acquisition of Egeln castle (Saxony-Anhalt) as new headquarters
1998
Development of world largest 4,5 MW wind mill (Enercon E 112 height:124m; rotor width: 112m)
2001
Read the full text
More than 50 MW installed
2002
Subsidiary in Paris, France
More than 100 MW installed
2005
Subsidiary in Goleniów, Poland
Subsidiary in Manchester, UK
Development of world highest wind mill from Vestas model V90 (125m)
More than 200 MW installed
2006
Development of largest wind farm in Cormainville, France at that time (30 Vestas V80-2MW wind turbines with combined nameplate capacity of 60 MW)
More than 300 MW installed
2007
New headquarter in Ganderkesee
Subsidiary in Bulgaria with partner
More than 400 MW installed
2008
Subsidiary in Portland, Oregon, USA
From Wikipedia’s article on Volkswind, shared under CC BY-SA 4.0.5